UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1984 [PAGE 341]

Caption: Board of Trustees Minutes - 1984
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 341 of 675] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



332

Table 3 FY 1985 Energy Conservation Request Project Priority List All University (Dollars in Thousands)

Priority 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Campus UG UG UG UG UG G UG UG G G G UG C Project Loop Chilled Water Systems — M R L , CSL, & Loomis Laboratory Connect Commerce West to Library Chilled Water Center Reclaim Condenser Heat — Meat Science Laboratory Chiller Drive Conversion — Vet. Med. Basic Sciences Building T r a p Utility Steam Main into Low Pressure Steam Main Window Insulation — Drug & Horticultural Experiment Station Winter Cooling Improvements — University Press Variable Air Volume Controls — 25 buildings Building Equipment Automation — C M E T & College of Pharmacy Lighting Controls — College of Dentistry Modify Fan Control Systems — Physical Education Building Nonessential Load Limiting by Remote Control Supplementary Cooling System — College of Pharmacy Abbott Power Plant Efficiency Improvements Loop Chilled Water Systems — DCL & CEB Night Setback Controls — Administrative Services Bldg. & C M W T Loop Chilled Water Systems — Student/Staff A.C. Ctr. & Morrill Hall Reduction of Air Volume — Roger Adams Laboratory Reheat Systems Zone Control — 13 buildings Radiation Zone Control I — 28 buildings Ventilation System Retrofit — Morrill Hall Domestic Hot Water Retrofit — 5 buildings Insulation Upgrades — High Temperature Hot Water Distribution System Modify Fan System — College of Nursing Steam Metering Improvements — 47 buildings Radiation Zone Control II — 28 buildings Conversion to Central Fan System — Armory Payback (Years) 1.00 1.06 1.19 1.24 1.25 1.38 1.39 1.40 1.48 1.51 1.61 1.62 1.75 1.79 1.79 1.90 1.90 2.22 2.38 2.38 2.41 2.49 2.58 2.64 2.67 2.71 2.75 Project Cost $ 356.6 411.0 293.0 2 936.9 178.3 32.2 170.6 1 318.1 301.4 199.6 181.7 1 426.6 84.0 465.2 713.3 186.6 868.4 542.8 387.7 369.1 537.0 53.9 90.0 235.3 728.8 721.8 93.8 Cum•ulalive Total $ 356.6 767.6 1 060.6 3 997.5 4 175.8 4 208.0 4 378.6 5 696.7 5 998.1 6 197.7 6 379.4 7 806.0 7 890.0 8 355.2 9 068.5 9 255.1 10 123.5 10 666.3 11 054.0 11 423.1 11 960.1 12 014.0 12 104.0 12 339.3 13 068.1 13 789.9 13 883.7

M O

g

o

•"i

3 G B 01

uc c UG

UG UG UC UC UC UG C G UC UC UC

1

1

CO

n T>

B D*