270

BOARD OF TRUSTEES

[June 16

(The student advisory vote was: Aye, Mr. Bandala, Mr. Cobb; no, none; absent, Miss Forsyth.)

Contracts for Food Service Facility, Veterinary Medicine Basic Sciences Building, Urbana

(30) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for converting approximately half of the first-floor student lounge in the Veterinary Medicine Basic Sciences Building to provide a food service facility, the award in each case being to the low bidder on its base bid plus acceptance of the indicated alternates. General Base Bid Total Johnson-Stirewalt Construction Co., Urbana $19 574 $16 574 Add. Alt. G-l $1 500 1 Ded. Alt. G-2 (2 0 0 0 ) ' Ded. Alt. G-3 (2 500) a Plumbing Able Mechanical Contractors, Homer 7 000 7 000 Electrical Central Illinois Electric Co., Pesotum Total

4 890

4 890 $28 464

A schedule of the bids received has been filed with the secretary of the board for record. Funds are available in the institutional funds budget of the College of Veterinary Medicine. Presently there is no food service facility other than vending machines in the Veterinary Medicine complex on the south side of the campus. The proposed facility would be converted from space within the existing lounge in the southwest corner of the building and provide a serving cafeterial and a realignment of space for vending machines. The work will consist of the installation of interior partitions, a storage area, limited flooring replacement, counters and countertops, and the installation of equipment acquired through the Purchasing Division. T h e work is scheduled to begin in July and to be completed by the middle of August. T h e facility will be operated by the Illini Union food service.

On motion of Mr. Madden, these contracts were awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Mr. Logan, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Cobb; no, none; absent, Miss Forsyth.)

Contract, Ramp for the Handicapped, Memorial Stadium, Urbana

(31) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $40,500 to English Brothers Company, Champaign, for construction of a concrete ramp for wheelchairs on the west side of Memorial Stadium.

Install quarry tile floor in the area of the walk-in cooler. Substitute prefinished hardboard over drywall in lieu of plastic laminate over plywood. Make one large storage area in lieu of 4 smaller storage areas on the west side of the lounge.

1 2 8