1986]

UNIVERSITY OF ILLINOIS

575

Funds as required will be authorized by a contract work order which will be charged against funds allocated for each project. A schedule of the bids received has been filed with the secretary of the board for record. It is also recommended that the comptroller be authorized to approve work orders under these contracts for projects whose costs do not exceed the limits established by the Illinois Purchasing Act. O n motion of M r . Howard, these contracts were awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. H a h n , Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. ( T h e student advisory vote was: Aye, Mr. L a m m ; no, none; absent, Mr. Becker.) Contracts for Minor Building Alterations, Repairs, and New Construction, Urbana (23) On April 18, 1985, the Board of Trustees approved the award of cost-plus contracts for minor building alterations, repairs, and new construction at the Urbana-Champaign campus for the fiscal year ending June 30, 1986, with an option to extend the contracts from July 1, 1986, through June 30, 1987, under the same terms and conditions. The president of the University, with the concurrence of the appropriate administrative officers, recommends that the option described now be exercised. The Operation and Maintenance Division at the Urbana-Champaign campus has recommended the exercise of the option since the work performed by each of the contractors for the eight divisions of work has been of high quality and a review indicates that the option price would be more favorable than the probable bid price. Funds as required will be authorized by a contract work order which will be charged against funds allocated for each project. O n morion of Mr. Howard, this recommendation was approved by the following vote: Aye, Mrs. Day, Mr. Forsydi, Mrs. Gravenhorst, Mr. H a h n , Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. ( T h e student advisory vote was: Aye, Mr. L a m m ; no, none; absent, M r . Becker.) Contract, Fire Alarm System, Illinois Street Residence Halls, Urbana (24) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $199,254 to Coleman Electrical Service, Inc., Mansfield, the low bidder, to install a new central firealarm system in the Illinois Street Residence Halls at the Urbana campus. The new system will consist of a central microprocessor fire alarm control panel with smoke detectors installed in corridors and other spaces and in individual dwelling units. The new system will provide additional safety. Funds are available from the Auxiliary Facilities System Repair and Replacement Reserve Account and the restricted funds operating budget of the Urbana campus Housing Division. A schedule of the bids received has been filed with the secretary of the board for record.