UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1986 [PAGE 321]

Caption: Board of Trustees Minutes - 1986
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 321 of 688] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



310

BOARD OF TRUSTEES

[June 20

Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Contracts for Remodeling, Special Medicine Clinic, Clinical Sciences Addition, Chicago

(29) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts to completely remodel the existing Special Medicine Clinic on the first floor of the Clinical Sciences Addition-North Wing, Chicago. The award in each case is to the low base bidder. General Industrial Structures, Inc., Chicago Plumbing A & H Plumbing & Heating Co., Inc., Chicago Mechanical Grove Mechanical Contractors, Inc., Elk Grove Village Electrical Ace Electric Construction, Inc., Chicago Total Base Bid $167 400 24 200 101 100 61 545 $354 245

T h e project is to upgrade 3,300 square feet of clinic area for special-purpose treatment rooms and ancillary activities for clinical and teaching functions. The facility has not been upgraded in fifteen years. Funds are available from the Hospital Income Fund. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Logan, these contracts were awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Miss Smith; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Lamm, Mr. Pittman; no, none.)

Contract for Theatrical Lighting, Assembly Hall, Urbana

(30) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract to Potter Electric Service, Inc., Urbana, for $159,000 to replace the theatrical lighting dimmer-bank system at the Assembly Hall, Urbana-Champaign campus. This project is to replace the present equipment, now 22 years old, with a new, solid-state, lighting, dimmer-control system to improve production capabilities. Funds are available in the Auxiliary Facilities System Repair and Replacement Reserve Account. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr. Logan, this contract was awarded by the following vote: Aye, Mrs. Day, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr.