1988]

UNIVERSITY OF ILLINOIS

547

A schedule of the bids received has been filed with the secretary of the board for record. (Alternate 1 is for construction of eight concrete aprons.) O n motion of Mr. Forsyth, this contract was awarded by the following vote: Aye, Mrs. Calder, Mr. Forsyth, Mrs. Gravenhorst, Mr. H a h n ,

Mr. Howard, Mr. Logan, Mrs. Shepherd, Miss Smith, Mr. Wolff; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Evenson; absent, Mr. Wylie.)

Contracts, Laboratory Animal Facility, Victor E. Shelford Vivarium, Urbana (15) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for construction of a laboratory animal facility and remodeling of the Victor E. Shelford Vivarium, Urbana. The award in each case is to the low base bidder, plus acceptance of the indicated alternates.1 Division I — General Mid-Am Builders, Champaign Base Bid . . . $71 285 Alt. G-l . . . 5 000 Alt. G-2 . . . 12 943 Alt. G-3 . . . 2 860 $ 92 088 Division II — Plumbing Reliable Plumbing & Heating Company, Champaign Base Bid 4 920 Division HI — Heating, Piping, Temperature Control, Ventilation, and Air Distribution Reliable Plumbing & Heating Company, Champaign Base Bid 29 245 Division IV — Electrical Witte Electric Company, Champaign Base Bid . . . 17 495 Alt. E-2 . . . 750 18 245 Total $144 498 It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work. The project consists of remodeling approximately 1,272 square feet of space and construction of a 22' x 57' wood frame addition to the existing building. The remodeled and newly constructed space will provide improved animal facilities for birds currently housed in the Natural History Building. State appropriated funds are available in the Fiscal Year 1988 Urbana campus operating budget. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Mr, Forsyth, these contracts were awarded by the following vote: Aye, Mrs. Calder, Mr. Forsyth, Mrs. Gravenhorst, Mr.

1

A schedule of the alternates is filed with the Kcretary of the board for record.