546

BOARD OF TRUSTEES

[May 11

Percent Total for Estimated Fee Subcontracts Payments

Percent for Material

Percent for Labor

Ventilation and Distribution Systems for Conditioned Air Reliable Plumbing & Heating Company, Champaign 5.0 60.0 2-0 $ 24 600 Plastering E. T. Drewitch, d/b/a/ E. T. Drewitch Plaster Contractor, Urbana 0.0 35.0 0.0 33 250 Insulation Champaign A & K Insulation Co., Champaign 13.8 71.9 9.0 29 630 Lightning Protection System Midwest Lightning Rods, Decatur 30.0 70.0 6.0 8 020 On June 11, 1987, the board approved the award of a cost-plus contract to Apple Contractors & Erectors, Inc., Taylorville, for asbestos abatement work for the fiscal year ending June 30, 1988, with an option to extend the contract from July 1, 1988, to June 30, 1989, under the same terms and conditions. (The total estimated fee payment is $118,500.) The president of the University, with the concurrence of the appropriate administrative officers, recommends that the option described now be exercised. Funds as required will be authorized by a contract work order which will be charged against funds allocated for each project. (The Operation and Maintenance Division at the Urbana campus has recommended the exercise of the option since the work performed by each of the contractors for these divisions of work has been of high quality and a review indicates that the option price would be more favorable than the probable bid price.) On motion of Mr. Forsyth, this recommendation was approved by the following vote: Aye, Mrs. Calder, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mrs. Shepherd, Miss Smith, Mr. Wolff; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Evenson; absent, Mr. Wylie.) Contract, South Farm Warehouse Storage Buildings, Urbana (14) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $173,638 to FBI Buildings, Inc., Remington, Indiana, the low bidder, on its base bid plus acceptance of Alternate 1, for the construction of three farm storage buildings on the south farm of the Urbana campus. The work consists of construction of three 6C x 152' metal-clad, frame buildings of 9,120 gross square feet. The buildings will be used for storage by the campus and the Colleges of Agriculture and Engineering. State appropriated funds are available in the Fiscal Year 1988 Urbana campus operating budget