1988]

UNIVERSITY OF ILLINOIS

545

Total Estimated Fee Payments

Percent for Material Roofing Frank Staar & Sons, Inc., Glenview Mechanical Insulation Insulco, Inc., Blue Island

Percent for Labor

Percent for Subcontracts

10.0 4.0

115.0 55.0

6.0 3.0

$121200 2b 250

T h e president of the University, with the concurrence of the appropriate administrative officers, recommends that the option described now be exercised. It is also recommended that the comptroller be authorized to approve work orders under these contracts for projects which costs will not exceed the limits established by the Illinois Purchasing Act. Funds as required will be authorized by a contract work order which will be charged against funds allocated for each project. (The Physical Plant Department at die Chicago campus has recommended the exercise of the option since the work performed by each of the contractors for the seven divisions of work has been of high quality and a review indicates that the option price would be more favorable than the probable bid price.) O n m o t i o n of M r . F o r s y t h , this r e c o m m e n d a t i o n w a s a p p r o v e d by t h e f o l l o w i n g v o t e : Aye, M r s . C a l d e r , M r . F o r s y t h , M r s . G r a v e n h o n t , M r . H a h n , M r . H o w a r d , M r . L o g a n , M r s . S h e p h e r d , Miss S m i t h , M r . Wolff; n o , n o n e ; a b s e n t , G o v e r n o r T h o m p s o n . ( T h e s t u d e n t advisory v o t e w a s : Aye, M r . E v e n s o n ; a b s e n t , M r .

Wylie.)

Contracts for Minor Building Alterations, Repairs, New Construction, and Asbestos Removal, Urbana

(13) On May 14, 1987, the Board of Trustees approved the award of the following cost-plus contracts for minor building alterations, repairs, and new construction at the Urbana-Champaign campus for the fiscal year ending June 30, 1988, with an option to extend the contracts from July 1, 1988, through June 30, 1989, under the same terms and conditions. Percent for Material General Dean Evans Company, Champaign Electrical Downtown Electric, Inc., Champaign Plumbing Reliable Plumbing & Heating Company, Champaign Percent for Labor Percent for Subcontracts Total Estimated Fee Payments

5.0

39.0

5.0

$121 000

15.0

37.0

3.0

30 300

5.0

46.0

2.0

14 130

Heating, Piping, and Refrigeration Reliable Plumbing & Heating Company, Champaign 5.0

46.0

2.0

32 550