UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1988 [PAGE 554]

Caption: Board of Trustees Minutes - 1988
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 554 of 629] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



544

BOARD OF TRUSTEES

[May 11

Contract, Telecommunication Systems Alterations, Repairs, and New Work, Chicago (11) On February 4, 1988, the Board of Trustees approved the award of a costplus contract to Hickey Electrical Contractors, Inc., Crestwood, for telecommunication systems alterations, repairs, and new work at the Chicago campus for the fiscal year ending on June 30, 1988, with an option to extend the contract from July 1, 1988, through June 30, 1989, under the same terms and conditions. (Total estimated fee payment is $123,250.) The president of the University, with the concurrence of the appropriate administrative officers, recommends that the option described now be exercised. It is also recommended that the comptroller be authorized to approve work orders under these contracts for projects which costs will not exceed the limits established by the Illinois Purchasing Act. Funds as required will be authorized by a contract work order which will be charged against funds allocated for each project. (The Physical Plant Department at the Chicago campus has recommended the exercise of the option since the work performed by the contractor for this division of work has been of high quality and a review indicates that the option price would be more favorable than the probable bid price.)

On motion of Mr. Forsyth, this recommendation was approved by the following vote: Aye, Mrs. Galder, Mr. Forsyth, Mrs. Gravenhorst, Mr. Hahn, Mr. Howard, Mr. Logan, Mrs. Shepherd, Miss Smith, Mr. Wolff; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Evenson; absent, Mr. Wylie.)

Contracts, Minor Building Alterations, Repairs, and New Construction, Chicago (12) On May 14, 1987, the Board of Trustees approved the award of the following cost-plus contracts for minor building alterations, repairs, and new construction at the Chicago campus for the fiscal year ending June 30, 1988, with an option to extend the contracts from July 1, 1988, through June 30, 1989, under the same terms and conditions. Percent for Material General J. L. Burke Contracting, Inc., Chicago Plumbing G. F. Connelly Co., Inc., Chicago Mechanical Scheck Mechanical Corporation, Justice Ventilation Blackhawk Industries, Inc., Chicago Electrical Unique Electric Co., Hillside . 1.0 Percent for Labor 40.0 Percent Total for Estimated Fee Subcontracts Payments 4.75 $ 83 875

4.9

65.6

4.9

52 875

1.0

50.0

1.5

76 750

2.5 2.0

51.0 54J

2.0 0.5

53 250 111 250