UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1988 [PAGE 423]

Caption: Board of Trustees Minutes - 1988
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 423 of 629] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1987]

UNIVERSITY OF ILLINOIS

413

Professional Firm FY 1988 Project Project Budget Recommended HVAC improvements, Psychology $370 000 Henneman, Raufeisen and Laboratory Associates, Champaign Masonry repairs, David Kinky Hall, 280 000 Isaksen, Matzdorff, Glerum & Davenport Hall Associates, Urbana HVAC improvements, Armory 330 000 S & R Engineering, Inc., Urbana Fire protection (planning), 50 000 S & R Engineering, Inc., Library Urbana Funds for employment of the professional firms have been appropriated to the Capital Development Board for FY 1988. O n m o t i o n of Mrs. Gravenhorst, this r e c o m m e n d a t i o n w a s approved by t h e following v o t e : Aye, Mrs. Calder, M r . Forsyth, Mrs. Gravenhorst, M r . H o w a r d , Mrs. Shepherd, Miss Smith, M r . Wolff; n o , n o n e ; absent, M r . L o g a n , Governor T h o m p s o n . ( M r . H a h n asked t o be recorded as not voting.) ( T h e student advisory v o t e w a s : Aye, M r . Evenson, M r . W y l i e ; n o , none.)

Employment of Engineers (Capital Development Board), Energy Conservation Projects, Chicago

(27) The University has been awarded an energy conservation grant of $915,670 for academic facilities for the Chicago campus under the Cycle VIII Federal Energy Conservation for Schools and Hospital Buildings Grants Program. To provide the matching funds required, the General Assembly authorized $458,782 in general revenue funds for Fiscal Year 1988. The president of the University, with the concurrence of the appropriate administrative officers, recommends, subject to the availability of funds, that the Capital Development Board be requested to employ the engineering firms identified below to provide the required professional services for the projects indicated. The fee for each firm will be negotiated in accord with the standard Capital Development Board fee structure for such projects. Project Budget Project Combustion controls and burner $260 940 modifications; condenser water filter system, Utilities Building 6 480 Classroom occupancy controls, Douglas Hall Outside air reduction modification, 127 100 Associated Health Professions Building VAV fans with economizer, 352 350 Clinical Sciences Building Fume hood modification, 168 800 College of Pharmacy Engineer Fluor/Daniels Engineering, Chicago J. N. Engineering, Evanston Stanley Howell & Associates, Glen Ellyn EME, Inc., Addison J. N. Engineering, Evanston

On motion of Mrs. Gravenhorst, this recommendation was approved by the following vote: Aye, Mrs. Calder, Mr. Forsyth, Mrs. Gravenhorst, Mr. Howard, Mrs. Shepherd, Miss Smith, Mr. Wolff; no, none; absent,