UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1988 [PAGE 424]

Caption: Board of Trustees Minutes - 1988
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 424 of 629] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



414

BOARD OF TRUSTEES

[October 15

Mr. Logan, Governor Thompson. (Mr. Hahn asked to be recorded as not voting.) (The student advisory vote was: Aye, Mr. Evenson, Mr. Wylie; no, none.) Employment of Engineers (Capital Development Board), Energy Conservation Improvements, Urbana

(28) T h e 85th General Assembly appropriated $88,354 in Capital Development Bond funds and the University has been awarded a grant of $104,284 from the U.S. Department of Energy for energy conservation improvements at the Civil Engineering Building, Urbana campus. T h e project includes extension of highpressure steam, condensate-return, and chilled-water lines from mains being installed under the north campus utilities and chiller plant project. Also included will be necessary modifications within the building. T h e project was developed as a result of the proximity of the lines to the north campus project. In order to complete the project within the Federal guidelines and to reduce disruption of construction, it is recommended that the same engineer that designed t h e north campus project be employed. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the Board of Trustees request the Capital Development Board to employ Sargent and Lundy Engineers, Chicago, for the professional services required. T h e professional fee will be negotiated by the Capital Development Board in accord with its procedures. O n m o t i o n of M r s . G r a v e n h o r s t , this r e c o m m e n d a t i o n w a s a p p r o v e d by t h e f o l l o w i n g v o t e : A y e , M r s . C a l d e r , M r . F o r s y t h , M r s . G r a v e n h o r s t , M r . H o w a r d , M r s . S h e p h e r d , M i s s S m i t h , M r . Wolff; n o , n o n e ; a b s e n t , M r . Logan, Governor T h o m p s o n . ( M r . H a h n asked t o b e recorded as not voting.) ( T h e student advisory vote w a s : Aye, M r . Evenson, M r . Wylie; no, none.)

Employment of Engineer (Capital Development Board), Plant and Animal Biotechnology Laboratory, Urbana

(29) T h e 85th General Assembly appropriated $1,000,000 in Capital Development Bond funds for site development of the new Plant and Animal Biotechnology Laboratory, Urbana. T h e work includes demolition, removal, and restoration of site improvements as well as street improvements in the area of Goodwin, Gregory, and Dorner Avenues between Nevada Street and Pennsylvania Avenue. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the Board of Trustees request the Capital Development Board to employ Crawford, Murphy & Tilly, Inc., Springfield, for the professional services required. T h e professional fee will be negotiated by the Capital Development Board in accord with its procedures. I n order to provide the preliminary design for the project in accord with the schedule, it has been necessary for the University to employ an engineer. Upon completion of the preliminary design phase, it is recommended that the Capital Development Board be requested to employ the engineer for the completion of the planning and construction of the project. Funds for the preliminary design phase are available in the Fiscal Year 1986 institutional funds budget of the Operation and Maintenance Division and for the balance of planning and construction, from capital appropriations to the Capital Development Board for FY 1988.