412

BOARD OF TRUSTEES

[October 15

postage, printing and photography, and telephone expenses anticipated through the completion of the project. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the contract with Smith, Hinchman & Grylls be increased by $61,000 for the additional reimbursables to be authorized by the University. The additional funds are available within the construction contract contingency allocation which was reviewed with the board on April 10, 1987. Funds are being provided from private gift funds through the University of Illinois Foundation and from funds appropriated by the State of Illinois.

On motion of Mrs. Gravenhorst, this recommendation was approved by the following vote: Aye, Mrs. Calder, Mr. Forsyth, Mrs. Gravenhorst, Mr. Howard, Mrs. Shepherd, Miss Smith, Mr. Wolff; no, none; absent, Mr. Logan, Governor Thompson. (Mr. Hahn asked to be recorded as not voting.) (The student advisory vote was: Aye, Mr. Evenson, Mr. Wylie; no, none.)

Employment of Architects and Engineers, Capital Development Board Projects, Urbana

(26) The 85th General Assembly appropriated $7,834,000 for certain renovation and repair projects for the University of Illinois to be funded through the "Build Illinois" program. Of the appropriations, the University has allocated $3,284,900 for projects at the Chicago campus, and $4,549,100 for Urbana. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends the Board of Trustees request the Capital Development Board to employ architects and engineers as indicated below for capital projects for Fiscal Year 1988 at the Urbana campus. T h e professional fee for each firm employed will be negotiated by the Capital Development Board in accord with its procedures. FY 1988 Project Project Budget $459 100 Develop manufacturing labs, Mechanical Engineering Building 40 000 Thermal fluids (planning), Mechanical Engineering Laboratory Chemistry, 500 000 Davenport Hall Expansion of library (planning), 50 000 Psychology Laboratory Complete shell space, third floor, 620 000 Veterinary Medicine Building MICA expansion, David Kinley Hall 450 000 Elevator replacement, Lincoln Hall Waste pipe system repairs, Burrill Hall, Turner Hall, Noyes L a b Electric a / c repair, Law Building Roof repairs, Hydrosystems Laboratory, Digital Computer Laboratory 200 000 240 000 200 000 355 000 Professional Firm Recommended R. P. Simon & Associates, Champaign R. P. Simon & Associates, Champaign Severns, Rishling & Associates, Inc., Champaign Unteed, Scaggs, Nelson, Ltd., Champaign Isaksen, Matzdorff, Glerum & Associates, Urbana Architectural Spectrum, Champaign ESCA Consultants, Champaign Brown, Davis, Mullins & Associates, Champaign Brown, Davis, Mullins & Associates, Champaign Severns, Rishling & Associates, Inc., Champaign