UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1988 [PAGE 421]

Caption: Board of Trustees Minutes - 1988
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 421 of 629] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1987]

UNIVERSITY OF ILLINOIS

411

Division II — Plumbing E. A. Wand Plumbing & Heating Co., Quincy Division HI — Electrical Ingram Electric, Inc., Jacksonville Total

Base Bid Base Bid

53 880 40 575 $370 205

It is further recommended that all contracts, other than the contract for general work be assigned to the contractor for general work. Funds for the project are available in the Fiscal Year 1988 capital budget. A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r s . Gravenhorst, these contracts w e r e a w a r d e d by the f o l l o w i n g v o t e : A y e , Mrs. Calder, M r . Forsyth, Mrs. Gravenhorst, M r . H a h n , M r . H o w a r d , M r s . Shepherd, Miss S m i t h , M r . Wolff; no, n o n e ; absent, M r . L o g a n , G o v e r n o r T h o m p s o n . ( T h e student advisory v o t e w a s : Aye, M r . Evenson, M r . W y l i e ; n o , none.)

Increase in Contract, Beckman Institute, Urbana

(24) On April 19, 1987, the Board of Trustees authorized a contract for $2,865,801 to Hatfield Electric Company, Rosemont, for the electrical work for the Beckman Institute at the Urbana campus. The Beckman Institute will be a computer-intensive environment. Therefore, it is essential that high-speed electronic networking be available at all points in the building, including public spaces where computer-based demonstrations and exhibits might be located. The changes proposed ensure that the capacity of networking is extended to several such places. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the contract with Hatfield Electric Company, Rosemont, be increased by $34,230 for the work described. The additional funds are available within the construction contract contingency allocation which was reviewed with the board on April 10, 1987. Funds are provided from private gift funds through the University of Illinois Foundation and from funds appropriated by the State of Illinois. O n m o t i o n of M r s . Gravenhorst, this r e c o m m e n d a t i o n w a s approved by t h e following v o t e : Aye, Mrs. Calder, M r . Forsyth, Mrs. Gravenhorst, M r . H a h n , M r . H o w a r d , M r s . Shepherd, M i s s S m i t h , M r . Wolff; n o , n o n e ] absent, M r . L o g a n , Governor T h o m p s o n . ( T h e student advisory v o t e w a s : Aye, M r . Evenson, Mr. Wylie; n o , none.)

Increase in Architectural/Engineering Contract, Beckman Institute, Urbana

(25) On Demember 10, 1985, and April 10, 1986, Smith, Hinchman & Grylls, Associates, Inc., Detroit, Michigan, was employed for professional services in the planning of the Beckman Institute project. In October 1986, the board approved an amendment to the 1986 contract to include reimbursements, estimated at $90,000. It is now estimated that the total reimbursables required during the construction phase will be approximately $151,000 for additional field trips, express mail