384

BOARD O F T R U S T E E S

[September

10

Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that this revision in the project be approved. Funds are provided from private gift funds through the University of Illinois Foundation and from funds appropriated by the State of Illinois. T h e three construction award phases of the project are as follows: Bid Package I — Site clearance, demolition, excavation, caissons, foundations, perimeter drainage, and waterproofing. (Awarded November 13, 1986) Bid Package II — Structural steel, concrete, metal deck, stairs, fireproofing, and elevators. (Awarded January 15, 1987) Bid Package III — Balance of construction, except site development work which is being deferred until early 1988. (Awarded April 9, June 11, and September 10, 1987) O n m o t i o n of M r . Wolff, this r e c o m m e n d a t i o n w a s a p p r o v e d b y t h e following v o t e : Aye, M r s . C a l d e r , M r . Forsyth, M r s . Gravenhorst, M r . H a h n , M r . H o w a r d , M r . L o g a n , M r s . S h e p h e r d , M i s s S m i t h , M r . Wolff; no, n o n e ; absent, Governor T h o m p s o n . ( T h e s t u d e n t a d v i s o r y v o t e w a s : Aye, M r . E v e n s o n , M r . W y l i e ; n o , none.)

Contract, Beckman Institute, Phase III, Urbana

(33) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $229,000 to FelmleyDickerson Company, Champaign, for Division III X — Vertical Isolation Units —• for the Beckman Institute, Urbana. T h e award is to the only bidder on its base bid. Funds are being provided from private gift funds through the University of Illinois Foundation and from funds appropriated by the State of Illinois. (The work consists of the installation of 16 vertical rising doors, customdesigned and built to isolate small, individual holding rooms so that special environmental conditions can be maintained.) O n m o t i o n of M r . Wolff, t h i s c o n t r a c t w a s a w a r d e d b y t h e f o l l o w i n g vote: Aye, M r s . Calder, M r . Forsyth, Mrs. Gravenhorst, M r . H a h n , M r . H o w a r d , M r . L o g a n , M r s . S h e p h e r d , M i s s S m i t h , M r . Wolff; n o , n o n e ; absent, Governor T h o m p s o n . ( T h e student advisory vote w a s : Aye, M r . Evenson, M r . Wylie; no, none.)

Increase in Project Budget, Renovation of Staff Apartments Building, Chicago (Reports of Rejection of Bids, and Action by the President)

(34) Bids for seven divisions of work for the renovation of the Staff Apartments Building, 1 Chicago, were received on February 10 and 12, 1987, and the total of the low bids exceeded the approved project budget of $3,730,000. T h e scope of the project was then reviewed, in particular, limitations imposed on the heating and ventilating system as a result of the height (eight feet) of the floors of the facility. Independent mechanical engineers were employed to analyze alternative ventilating systems and their effect on the project budget. It was concluded that an induction system would provide the most satisfactory working environment instead of the originally designed constant volume, horizontal duct, air distribution system.

1

The Staff Apartment! Building u located at 809 South Manhfirld.