Repository: UIHistories Project: Board of Trustees Minutes - 1988 [PAGE 393]

Caption: Board of Trustees Minutes - 1988
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 393 of 629] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1987]

UNIVERSITY OF ILLINOIS

383

Howard, Mr. Logan, Mrs. Shepherd, Miss Smith, Mr. Wolff; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Evenson, Mr. Wylie; no, none.)

Contract, Resurfacing Exterior Walks (Phase II), Assembly Hall, Urbana

(31) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $80,889 to University Asphalt Company, Urbana, to resurface the exterior walks at the Assembly Hall at the Urbana campus. The award is to the low base bidder. On June 11, 1987, the Board of Trustees approved the award of a contract for Phase I of this project, which included the removal and replacement of approximately one-half of the bituminous sidewalks on the north and portions of the east and west sides of the Assembly Hall. This project now has been completed. The Phase II work consists of removal and replacement of the remaining bituminous sidewalks on the east, south, and a portion of the west sides of the Assembly Hall. Funds are available in the Auxiliary Facilities System Repair and Replacement Reserve Account. A schedule of the bids received has been filed with the secretary of the board for record. O n m o t i o n of M r . Wolff, this contract was a w a r d e d by the f o l l o w i n g v o t e : Aye, M r s . Calder, M r . Forsyth, Mrs. Gravenhorst, M r . H a h n , M r .

Howard, Mr. Logan, Mrs. Shepherd, Miss Smith, Mr. Wolff; no, none; absent, Governor Thompson. (The student advisory vote was: Aye, Mr. Evenson, Mr. Wylie; no, none.)

Increase in Contracts, Beckman Institute, Urbana

(32) An April 9 and June 11, 1987, the Board of Trustees authorized the award of contracts for Divisions A through W for Phase III construction work for the Beckman Institute at the Urbana campus. Subsequently, the director of the institute requested the conversion of firstfloor space at l i e east end of the north building from office/storage to wet laboratory space. Changes are required in the divisions noted below to convert 2,000 square feet. The cost is not to exceed $276,177. Not to Exceed Division of Work Amount of Change III C — Plumbing $109 899 III D — Fire Protection 4 469 III E — Heating 17 505 III F —Ventilation 30 030 III G — Electrical 19 770 III J — Carpentry 5 035 III K — Drywall/Finishes 3 996 III Q — Casework 82 200 III W — Carpet 3 273 Total $276 177