EXTRACTED TEXT FROM PAGE:



1986]

Division I — General J. P. Cullen & Sons, Inc., Janesville, Wisconsin . .

UNIVERSITY OF ILLINOIS

109

Base Bid Alt. CM Alt. G-2 Alt. G-4 Alt. G-9

$4 495 13 6 43 58

332 000 100 000 000 $4 615 432

Division II — Plumbing Paul H. McWilliams & Sons, Inc., Champaign

Base Bid

424 000

Division III — Heating, Piping, Refrigeration, and Temperature Control R. H. Bishop Company, Champaign . . . Base Bid Alt. H-3 Alt. H-4 Division IV — Ventilation and Air Distribution Viking Plumbing & Heating, Inc., Danville

922 724 15 778 3 896 942 398

Base Bid Alt. V-3

279 300 15 100 294 400

Division V — Electrical Beraer Electric, a division of Bemer Plumbing & Heating, Inc., Bloomington

Base Bid . Alt. E-l . Alt. E-2 . Alt. E-3 . Alt. E-10

698 880 875 400 26 500 1 900

728 555

Division VI — Fire Protection The PIPCO Companies, Ltd., Peoria Total

Base Bid

122 590 $7 127 375

It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work. The project is to upgrade the facility to make it energy efficient, relatively maintenance-free, and self-supporting. The work consists of removal and replacement of interior partitions, electrical, plumbing, heating, ventilation, and air conditioning systems, as well as the food service equipment. Additions to the facility include stair towers, a five-story addition to Evans Hall, a dining room and plaza at Busey Hall, a receiving dock on the east side of Busey Hall, and an entrance between the two buildings. It is also recommended that the firm of Bradley, Likins, Dillow, Drayton of Decatur be employed for the professional architectural/engineering services required during the construction contract administration and on-site field representation. The firm will be employed for the construction contract administration phase, which includes one site visit per week, at a fixed fee of $93,000. The firm also will provide a full-time, on-site representative for the duration of the project. Compensation will be on an hourly basis at an amount not to exceed $80,600, plus authorized reimbursements, estimated at $11,000.