UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1980 [PAGE 705]

Caption: Board of Trustees Minutes - 1980
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 705 of 744] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



694

BOARD O F T R U S T E E S Enke, S., invention, patent rights, release to Foundation, 103 Environmental analysis (Chicago Circle), area of specialization, established, 346 Environmental Data Information Services, National Climate Center, contracts, 622 Environmental Research Laboratory (Urbana), contracts, remodeling, architectural services, 464 engineering services, 464 Erickson, j . G., undergraduate instructional award, 532 Eron, L., ^ defendant, suit seeks reinstatement of plaintiff in Ph.D. program and recovery of damages, authority to provide representation, 473 Erwin, W. H., appointment. 434 Escrow account, Bank of St. Paul (Minnesota), established, 318 Etemadi, N., appointment, 397 Elhridge, V. K., appointment, 54 Evans, D. J., appointment, 214 Evans. Dean, Company, contracts, 190, 276, 5G7, 589 Evered, R. D., appointment, 54 Everett, H. \V., II, appointment, 214 Ewing, B. B., leave of absence, 606 Ewing Plumbing, Inc., contract, 487 Executive Committee election, 166, 501 Paulina Street (Chicago), reopening, referral, 169, 208 ff. Executive Consulting Group, Inc., contracts, 539, 570 extension, 568 Executive session, 33, 80, 116, 138, 161, 196, 232, 258, 284, 332, 372, 421, 447, 471, 493, 498, 520, 552, 578, 598, 628 scheduled at beginning of each Board meeting, 480 Executive Vice President, name, changed from Vice President for Administration, 636 Eye and Ear Infirmary (Medical Center) contracts, corrective work, architectural services, 157 Eye and Ear Infirmary Building (Medical Center), contracts, construction work, general, tomography x-ray unit, remodeling, 19 electrical work, tomography x-ray unit, remodeling, 19 plumbing work, tomography x-ray unit, remodeling, 19 ventilation work, tomography x-ray unit, remodeling, 19 Ever, E. J., appointment, 184 Facilities Design Ltd., contract, 463 Facility Security Clearance, University officers designated, 25, 361 Faculty Advisory Committee (all campuses), amendment of University Statutes, approved, 350 Faculty Advisory Committee (Medical Center), letter regarding faculty participation in University governance, 436 Faculty/Alumni Center (Medical Center), contracts, remodeling, architectural services, 112 engineering services, 112 Faculty appointments. See Appointments, made by the president Falk, G., curriculum development grant, 607 Family Medicine, Department of (Rockford School of Medicine), chairperson, appointment, 508 established: 125 Family Physicians Center, contracts, 14, 270 Farb, H. F., appointment, 394^ Farber, I. E., defendant, suit seeks reinstatement of plaintiff in Ph.D. program and recovery of damages, authority to provide representation, 473 Farmer, T. S., member of advisory committee, 49 Farrell, J. T-, honorary degree, 241

Engineering services, cont'd Medical Center, Anatomy Laboratory, remodeling, 464 building equipment automation, remodeling assigned to University, 464 Chicago Iilini Union, addition, 109 chilled water facility, 109 remodeling, 366 College of Medicine, Conference Center, remodeling, 112 Dentistry-Medicine-Pharmacy Building, Second Unit, remodeling, 65 electrical upgrade system, remodeling, assigned to University, 464 Faculty/Alumni Center, remodeling, 112 handicapped, provisions for, assigned to University, 464 Hospital Billing, remodeling, 464 masonry repairs, assigned to University, 464 Men's Residence Hall, chilled water facility, 109 miscellaneous remodeling, rehabilitation, and alteration work, 314, 656 amended, 488 Occupational Safety and Health Act and Code Corrections, remodeling, 464 Orthopedics, Department of, first floor, remodeling, 464 Recreation Facility, chilled water facility, 10!) roof repairs, assigned to University, 464 Single Student Residence, 106 change, 154, 276 chilled water facility, 109 Student Residence Hall, remodeling, 366 Women's Residence Hall, chilled water facility, 109 remodeling, 366 Monticello, Allerton Park, improvement projrct, 366; 409 previous action of Board rescinded, 409 Urbana, Animal Room improvements, remodeling, 464 Assembly Hall, 110 Beckwith Living Center. 65 elevator installations, 464 elevator replacement, 464 energy conservation ventilation turndown, remodeling, 464 English Building, remodeling, 65 Environmental Research Laboratory, remodeling, 464 Foreign Languages Building improvements, remodeling, 464 Iilini Union, repair of patio. 462 Iilini Union Bookstore, addition and remodeling, 109 Krannert Center for Performing Arts, remodeling, 4C4 McKinley Health Center, elevator installation, 463 Meat Science Laboratory, Phase II, remodeling, 464, 488 previous action of Board rescinded, 488 Morrill Hall, remodeling, 464 Noyes Laboratory, remodeling, 464 paraplegic ramp improvements, remodeling. 464 Swine Research Center, remodeling, 464 temperature control remodeling, 464 temperature control replacement, 464 Veterinary Medicine Research Building, remodeling, 464 English, Curriculum in the Teaching of (Chicago Circle), revision, 57 English, Department of (Chicago Circle), head, appointment, 637 English Building (Urbana), contracts, remodeling, architectural services, 65 engineering services, 65 English competency test, all campuses, approved, 125