UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1980 [PAGE 704]

Caption: Board of Trustees Minutes - 1980
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 704 of 744] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



UNIVERSITY OF ILLINOIS Electrical work, cont'd tion, 250 chilled water system, addition, 250 baseball field, 275 rejection of bids, 275 withdrawal of bid, 275 Chicago Circle Center, Great Circle Hall, food facility and lounge, 176 12KV switchgear, purchase and installation, 310 minor building alterations, repairs and new construction, 654 Parking Structure No. 2, increase, 365 Pavilion 569 Roosevelt Road Building, power service, increase, 367 special raceway for power cables, 367 running track, 275 rejection of bids, 275 withdrawal of bid, 275 soccer field, 275 rejection of bids, 275 withdrawal of bid, 275 softball field, 275 rejection of bids, 275 withdrawal of bid, 275 Lisle, Animal Housing Facility, Pharmacognosy and Horticultural Drug Station, replacement of air conditioning and ventilation system, 189 Medical Center, Chicago Illini Union Addition Recreation Facility, 486 chilled water facility, 407 rejection of bids, 407 College of Medicine West Tower, biological chemistry departmental office, remodeling, 312 Eye and Ear Infirmary Building, tomography x-ray unit, remodeling, 19 General Hospital, Diagnostic Clinic, renovation. 487 Hospital, University. Eye and Ear Infirmary, ophthalmology departmental office, remodeling, 313 minor building alterations, repairs and new construction, 654 parking facilities, Lot G, 314 Room 3193, install power feeder supply, change, 623 Single Student Residence, 106 electric service station, installation, 366 Women's Residence Hall, remodeling, 587 Monticello, Allerton Park, improvement project, 439 Peoria School of Medicine, recreational facilities. 588 Urbana, Beckwith Living Center, 589 rejection of bids, 589 Dairy Milking Parlor, rejection of bids. 362 Illini Union Bookstore, addition and remodeling. 276, 566 Library Building, connect computer equipment, 114 McKinley Health Center, elevator installation. 567 repairs, minor remodeling, and new construction, 274 extension, 655 Electrochemical Technology Corporation, contracts, 70, 157 Elementary and Early Childhood Education, Department of (Urbana), chairperson, appointment, 212 Elevator_ installations (Urbana), contracts, architectural services, 464 engineering services, 464 McKinley Health Center, architectural services, 463 engineering services, 463 Elevator replacement (Urbana), contracts, architectural services, 464 engineering services, 464

693

Eleveld B., appointment, 434 Eli Lilly and Company, contract, 192 Eliot, R., appointment, 266 Ellis, A., litigation, suit seeking damages for personal injuries, employment of special counsel, authorization, 200 El-Masry, E. I., appointment, 54 EImhur5t Electric Co., contract, 189 El-Neweihi, E. A. W., appointment, 96 El-Rahi, E., defendant, suit for recovery of damages, authority to provide representation, 423 Ely, R. W-, appointment, 54 Emery Distribution Systems, Inc., freight forwarder, power of attorney, resolution, adopted, 190 name, changed from D. C. Andrews International, Inc., 190 Endodontics, Department of (Medical Center), head, appointment, 267 Endowment funds, investments, report, 30, 73 Enercon, Ltd., contract, 28 Energy, purchases, 317, 659 Energy conservation ventilation turndown (Urbana), contracts, remodeling, architectural services, 464 engineering services, 464 Energy Engineering, Department of (Chicago Circle^, head, appointment, 602 Enfield (White County), lease, gas, 649 oil, 649 Engelbrecht-Wiggans, R., appointment, 560 Engineering, College of (Chicago Circle), acting dean, appointment, 7 advisory board, appointments, 559 reactivated, 559 dean, appointment, 267 decrees, conferred, 327, 328, 329, 665. 666 Engineering, College of (Urbana), degrees, conferred, 76, 137, 195, 332, 420, 447, 548, 669 five-year computer science/accountancy program, established, 400 gift, loan fund, Ford Foundation, residual cash balance invested to provide grantin-aid merit awards to undergraduate students, 534 Engineering services, contracts, Chicago Circle, air handling systems, modifications, 463 Architecture and Art Laboratory, 109, 277 Art Department Photograph Area, remodeling. 463 baseball field, 129 Health, Physical Education, and Recreation. College of, remodeling, 463 Lecture Center Building, 277 Phase II, drain repairs, 463 gutter repairs, 463 roof repairs, 463 masonry repairs, assigned to University, 463 miscellaneous remodeling, rehabilitation, and alteration work, 314, 656 amended. 488 Pavilion, 108 Phase I, walkway and stairway repairs, 463 running track, 129 Science and Engineering Laboratories, Computer Center, remodeling, 463 remodeling. 463 Science and Engineering Laboratory, 109 site improvements accessibility, 463 soccer field, 129 softball field, 129 stack emission control, assigned to University, 463 temperature control systems, modifications, 463 University Theatre, lighting, assigned to University, 463 ticket booth, assigned to University, 463