UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1938 [PAGE 315]

Caption: Board of Trustees Minutes - 1938
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 315 of 1002] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1937]

UNIVERSITY OF ILLINOIS waste as shown; cutting in 2" vent opening in 3" vent west of column No. D-8 first floor and installing vent for the 4" trap in basement as shown; installing a 4" x 2" tee with 2" valve only in present 4" unfiltered cold water line at basement ceiling north of column No. D-9 as shown; and cutting in a %" valved opening only in present 2" filtered water line a t basement ceiling west of column No. D-8; including the necessary cutting and patching of walls and floors, and the necessary painting, for plumbing work, but not including pipe covering or insulation. Add the sum

of

$

313

230 0 0

V. Heating Contract Change Order No. 13 Air-conditioning Surgical Amphitheatre Room No. 412—Drawing No. 6 1 : Air-conditioning heater erection and connection. Temperature control as specified (air risers for same are now roughedin). Connections for "Nesbitt" Air-Conditioning Heaters (Control connections). "York" equipment and refrigeration machinery with control. Furnish and install 3" cork covering on all work as specified including water circulating pump. Furnish and install Instantaneous Water Heater. Furnish and install water piping. Receive and connect air-washer circulating pump. All work to be installed in accordance with specification letters of October 29 and November 2, 1936, and Drawing No. 61. Add the sum of $7 315 00 VI. Ventilating Contract Change Order No. 8 Air-conditioning Surgical Amphitheatre Room No. 412—Drawing No. 6 1 : I Class 800 Special Sirocco Air Washer 9'o" long and approximately 2'8" wide by 4'6* high, complete with two banks of spray nozzles, galvanized iron casing, eliminators, interior piping, concrete base, etc., as specified. I DL-2" Chicago Pump Company double suction, single stage, horizontally split shell pump with direct connected 5 H.P. 3 phase, 60 cycle, 220 volt, 1750 R.P.M. motor. Capacity of this pump 90 gallons per minute a t 100' head. 1 Section No. L-737 Nesbit Heating Surface. 2 Sections No. M-735 Nesbit Heating Surface. Cover air-washer and casing with 1" thick corkboard, applied with hot pitch, finished off with %" asbestos cement and a canvas jacket, also 2" thick cork between air washer and concrete base as specified. Work shall be complete in every detail and shall be in accordance with drawing No. 61 and specification letter of October 29, 1936. Add the sum of $1 892 00

On motion of Mr. Moschel, this resolution was adopted, by the following vote: Aye, Mr. Adams, Mr. Cleary, Mr. Karraker, Mr. Mayer, Mr. Moschel, Mrs. Plumb; no, none; absent, Mrs. Freeman, Mr. Horner, Dr. Meyer, Mr. Pogue, Mr. Wieland.

W A G E S O F PHYSICAL P L A N T E M P L O Y E E S (25) Last February the janitors of the Physical Plant Department submitted a petition for an increase in their wages from the present scale of 49 cents per hour for day work and 5 3 ^ cents per hour for night work to 60 cents per hour, or a fixed minimum monthly wage of J140, to become effective with the beginning of the bi-