BOARD OF TRUSTEES

[ J u l y 16

period when such was needed. The Public Works Administration has indicated that it will approve this addition to the contract.

On motion of Mrs. Plumb, this authorization was granted.

CONTRACT CHANGE ORDERS FOR MEDICAL A N D DENTAL BUILDING (24) In accordance with the authorization of the Board on January 24, 1936, the following contract change orders of work on the Medical and Dental Building have been approved, and the following resolution is offered to ratify said actions: Be it resolved, that the Board of Trustees hereby approves and ratifies the action of the President of the University in authorizing the following contract change orders on the second unit of the Medical and Dental College Laboratories in process of construction as Illinois Public Works Administration Project No. 1057: I. General Contract Change Order No. 37 For changes in Rooms 916 and 917 in accordance with revision drawing No. 62 and sketch dated January 4, 1937, based upon the case and wicket work being of hollow metal with painted finish, add the sum of % 822 For furnishing and erecting P.W.A. tablet as shown on drawing No. 1 0 5 6 ^ , in accordance with proposal dated May 6th, 1937, add the sum of 187 $1 009 For omitting one coat of Lithophone on Acoustone ceilings in corridors and lobbies, in accordance with proposal dated April 21st, deduct the sum of m Total Addition $ 898 Change Order No. 38 For providing 172 openings, 12' x 15", in metal pan construction to permit passage of plumbing pipes a t dental units, a t fl.50 each $ II. Heating Contract Change Order No. 13 For changes in Heating Work in Rooms 916 and 917 as shown on revision drawing No. 62, in accordance with proposal dated November 20, 1936, add the sum of $ I I I . Electrical Contract Change Order No. 13 For changes in Electric Wiring Work in Rooms 916 and 917 as shown on revision drawing No. 62, in accordance with revised proposal dated November 23, 1936, add the sum of $ Change Order No. 15 Air-conditioning Surgical Amphitheatre No. 412—Drawing No. 6 1 : Furnish material and labor required to wire to and connect a 25 H P refrigerator compressor motor and a 5 H P air washer circulating pump motor and a vapor-proof light outlet in air washer. All work to be in accordance with specification letter of October 29, 1936, and Drawing No. 61. Add the sum of $ IV. Plumbing Contract Change Order No. IQ For the omission of all sheet metal service boxes for dental units thruout the building, deduct the sum of $ Change Order No. 21 Air-conditioning Surgical Amphitheatre Room No. 412—Drawing No. 6 1 : Cutting in 4 ' opening in present 4* waste at south wall of basement near column No. C-9 to install 4* trap and open

40 00 40 00 40

258 00

14 96

69 66

511 89

502 65