282

BOARD OF TRUSTEES Piping in Mechanical Rooms not included. Omit one coat of paint on all exposed piping, d e d u c t . . $ Omit one coat of paint on all covered piping, d e d u c t . . Total Deduction Plus 5%

[June 9

469 00 424 00 $

$

893 00

667 00

$ Plus 10% Net Addition $

33 700 70 770

35 35 04 39

I I . Plumbing Contract Change Order No. 18 F o r furnishing and installing on present roughing-in openings in Dark Room No. 842, one 2 0 x 2 0 x 6 " deep inside alberene stone sink with 12" high box back and left hand end piece, V/2" chemical lead drain plug with stopper, strainer and tailpiece, i}4" chemical lead P trap, No. 540 C.F. Co. swing spout faucet underslung type, rim of sink to set 3 8 ^ " high, add the sum of $81 55 III. Electrical Contract

Change Order No. 12 Additional labor and material required to install twenty-four (24) ceiling outlets on 12th floor ceiling due to substitution of Perfatile ceiling for plaster ceiling, add the sum of 40 90 Additional labor and material required to install floor box in 14th floor slab to terminate present conduits serving outlets in partition between rooms #1406 and #1408 at column B-7-J4, due to omission of this partition, add the sum of 10 54 Additional labor and material required to move switch outlet in room #1108 and add conduit stub in room #1106, add the sum of 12 54 Additional labor and material required to move exit outlet due to change in door buck in passage to stairs in room # 9 2 7 , add the sum of 10 11 Additional material and labor required to install two (2) outlets in soffit at wickets near Column B-5 Room #512, add the sum of.. 24 00 Total Addition $98 09 Omit three (3) bracket outlets in south and north walls of room # 1409, deduct the sum of 3 00 Net Addition $95 09

On motion of Mrs. Plumb, the resolution was adopted.

AGREEMENT W I T H ASSOCIATION OF AMERICAN RAILROADS FOR INVESTIGATION OF C O N T I N U O U S W E L D E D RAILS (17) A recommendation from the Dean of the College of Engineering for the approval of an agreement with the Association of American Railroads for a cooperative investigation of the strength, ductility, and toughness of continuous welded rails by the Engineering Experiment Station. T h e agreement is drawn for a period of two years from May 1, 1937, unless previously terminated by the Association on at least three months' notice in advance, and the Association agrees to contribute up to $20,000 to cover the expenses of the investigation. T h e agreement conforms to t i e University Statutes and policies governing such cooperative research projects.

On motion of Mr. Cleary, the execution of this agreement was authorized as recommended.

INVESTIGATION OF SANITARY STANDARDS OF MILK BOTTLE CAPS (18) T h e Associated Milk Dealers Incorporated of Chicago have asked the University to undertake the investigation of problems relating to sanitary milk