1937]

UNIVERSITY OF ILLINOIS

26l

"(5) Delay on work in amphitheatres now prevents turning elevators over for completion and the main lobby and entrance for finishing. "(6) Delay in awarding contract on lighting fixtures, due to the fact t h a t the owner was not advised of changes in P.W.A. regulations. "(7) The extension of time requested is eleven weeks. "(8) In consideration of the granting of the extension of the time for completion of this project as requested in this letter, we agree to relinquish any claims we may have against the University of Illinois for damages or additional compensation t h a t may be due to the delays detailed above." Now therefore be it resolved, by the Board of Trustees of the University of Illinois, that we agree to the request of the contractors for an additional extension of time from May I, 1937, to July 15, 1937; and Be it further resolved, t h a t we hereby request of and recommend to the United States, acting through the Federal Emergency Administration of Public Works, t h a t an extension of time be granted for the completion of the above described project from May 1, 1937, to July 15, 1937.

On motion of Mr. Moschel, this resolution was adopted.

CONTRACT CHANGE ORDERS FOR MEDICAL A N D DENTAL BUILDING (15) In accordance with the authorization of the Board on January 24, 1936, the following contract change orders of work on the Medical and Dental Building have been approved and the following resolution is offered to ratify said actions: Be it resolved, t h a t the Board of Trustees hereby approves and ratifies the action of the President of the University in authorizing contract change orders on the second unit of the Medical and Dental College Laboratories Building. I. General Contract Change Order No. 25—Revised For omission of photo murals in rooms 520 and 1202, deduct the sum of $1 For applying two coats of lead and oil where photo murals are omitted, add the sum of Net Credit $1 Change Order No. Jo For omitting suspended ceilings in rooms 28, 31, 35, 36 and 37, deduct the sum of $ Addition for extending tile partitions, plastering and painting from point of suspended ceiling heights to concrete ceilings Net Extra $ Change Order No. 31 For furnishing labor and material for construction of new street curbs: Polk Street Patch present curbs $ 18 75 Excavation 54 60 Concrete 88 40 Concrete forms 123 ° ° Concrete finish 4r i° Wood Street Remove stone curb Excavation Concrete Concrete forms Concrete Add for curbed forms 17 46 78 139 41 13 00 40 00 °° 4° °°

305 00 75 ° ° 230 00

272 10 346 90 74 8 o

?325

8S

finish

Finish concrete slab in corner Polk and Wood Streets Excavation Slab Net Extra

10 32 18 00

g 28 32

3688 97