PART III - H. 8) The telephone lines will continue to enter the campus from north and south along Shepherd Road, but in the future will follow the alignment of the outer ring road to the east, as noted on the plans, and enter the Central Academic area from the north.

Power Plant and Distribution: 9) The Power Plant is located near the northwest end of the pedestrian Concourse and from this location all internal circulation of heating and gas will emanate.

10) The control of all heating, ventilating and air cooling will be accomplished &t the plant. 11) The main channel of these internal utilities to most academic buildings will be the easily accessible ceilings of the Concourse. The ceilings of the secondary pedestrian routes within the buildings will carry the utilities from the main channel. 12) It is planned that three cooling centers will provide cooling for the entire campus. These three centers are planned so that their associated cooling towers will be in elevated enclosed locations, properly screened and acoustically treated. These cooling centers will be of a sectionalized design so that they may expand as additional areas of the campus are constructed. Sanitary Sewers and Trash Disposal: 13) Sanitary sewers will carry all normal waste including garbage disposal. 14) Compaction of all trash at several convenient locations, and off-site disposal, are recommended.

52