Repository: UIHistories Project: Board of Trustees Minutes - 1994 [PAGE 613]

Caption: Board of Trustees Minutes - 1994
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 613 of 692] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1996]

UNIVERSITY OF ILLINOIS

601

(The student advisory vote was: Aye, Mr. Mathew, Mr. Rose; no, none; absent, Mr. Malone.)

Contracts for Phase II Remodeling, Roger Adams Laboratory, Urbana

(17) The president of the University, with the concurrence of the appropriate University officers, recommends the award of the following contracts for the Phase II remodeling project in Roger Adams Laboratory at the Urbana campus. Competitive bidding in accordance with the Illinois Purchasing Act was followed; and the award in each case is to the lowest responsible bidder on the basis of its base bid plus acceptance of the indicated alternates.1 Division I — General English Brothers Company, Champaign

Base Bid.... Alt. #G-1... Alt. #G-2... Alt. #G-3... Alt. #G-4...

$257 10 15 25 46

200 401 400 900 600 $355 501

Division II — Plumbing Reliable Plumbing and Heating Company, Savoy

Base Bid. Alt. #3 .. Alt. #4 ..

98 045 17 860 23 650 139 555

Division III — Heating, Piping, Refrigeration, and Temperature Control McWilliams Mechanical, Inc., Champaign Base Bid Alt. #3 Alt. #4 Division TV — Ventilation and Air Distribution B.E.C. Mechanical, Inc., Ogden Base Bid. Alt. #3 . Alt. #4 . Division V — Electrical Glesco Electric, Inc., Urbana.

173 300 4 500 2 500 180 300 58 490 3 460 9 470 71 420

Base Bid. Alt. #2 .. Alt. #3 .. Alt. #4 ..

94 847 972 15 888 17 087 128 794 $875 570

Total.

The $1,220,000 project consists of removing mezzanine levels A and B and replacing them with a new floor to be level with the first floor of the Roger Adams Laboratory for the Chemical Engineering Department. The 6,750 nasf remodeling

1 Description of Alternates: #1 — Assignment Fee; #2 — Canopy over receiving area; #3 — Fit out/finish Room 112; #4 — Fit out/finish Room 112A.