BOARD OF TRUSTEES

[May 9

petitive bidding in accordance with the Illinois Purchasing Act was followed; and the award in each case is to the lowest responsible bidder on the basis of its base bid plus acceptance of the indicated alternates.1 Division I — General Castle Construction Corporation, Markham

Base Alt. Alt. Alt. Alt. Alt.

Bid G-l G-2 G-3 G-4 G-5

$2 459 000 29 270 100 000 205 000 2 800 4 000 $2 800 070

Division II — Plumbing A 8c H Plumbing and Heating Co., Inc., Elk Grove Division III — Heating, Piping, Refrigeration, and Temperature Controls G. F. Connelly Mechanical Contractors, Inc., Chicago Division IV — Ventilation and Air Distribution R. J. Olmen Company, Glenview Division V — Electrical M. G. Electric Service Co., Inc., Arlington Heights

Base Bid

278 000

Base Bid

465 624

Base Bid

150 305

Base Bid Alt. E-l

1 042 000 15 400

1 057 400 Total $4 751 399 The $6,657,859 project consists of a the new construction of a 23,451 gsf brick masonry Transportation Facility and an attached 1,702 gsf Telecommunications Node #4 Facility. The administrative support functions for the Transportation Facility will be located in a one-story building with a partial basement. Attached to the east will be a one-story vehicle garage supporting ten service and repair bays. Attached to the north is a one-story Telecommunications Node #4 facility which includes a basement level. Funds are available from the following sources: Appropriated Funds; UIC Telecommunications Department Funds; and Institutional Funds Operating Budget of the Physical Plant Department. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Ms. Reese, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mrs. Calder, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Governor Edgar.

1 Description of Additive Alternates: G-l — For acceptance of assignment of the other contract divisions of work-Divisions II through V; G-2 — For completion of site development from the police parking lot to the northernmost site boundary; G-3 — For provision of a Natural Gas Vehicle Fueling Station; G-4 — For provision of loading dock seals at Loading Dock 117 in the Transportation Facility; G-5 — For provision of a second interior-glazed sidelight in the Transportation Facility; E-l — For electrical provisions of a Natural Gas Fueling Station.