|
| |
Caption: Board of Trustees Minutes - 1994 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
258 BOARD OF TRUSTEES [April 13 Contracts for Minor Building Alterations, Repairs, and New Construction, Urbana (19) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following cost-plus contracts for minor building alterations, repairs, and new construction at the Urbana-Champaign campus for the fiscal year ending June 30, 1996. Awards will be made to the lowest responsible bidders. The University has the option of extending the contracts from July 1, 1996, to June 30, 1997, under the same terms and conditions; subject to approval by the Board of Trustees. The contractors bid on percentages to be applied to an estimated volume of material, labor, and subcontractors. Percent for Material General Barber 8c DeAtley, Inc., Urbana Plumbing Reliable Plumbing and Heating Company, Savoy Heating, Piping, and Refrigeration Reliable Plumbing and Heating Company, Savoy Ventilation and Air Distribution Ruyle Corporation, Peoria Insulation Sprinkmann Sons Corporation of Illinois, Peoria Electrical Coleman Electrical Service, Inc., Mansfield Plastering, Plaster Patching, and Repairs Dean Evans Company, Champaign Excavation, Grading, and Hauling Dean Evans Company, Champaign Asbestos Abatement M & O Environmental Company, East Hazel Crest Percent for Labor Percent for Subcontracts Total Estimated Fee Payments 5.0 34.0 4.0 $322 800 10.0 35.5 5.0 14 390 10.0 35.5 5.0 89 880 5.0 40.0 3.0 57 460 10.0 48.0 3.0 43 520 5.0 33.0 5.0 76 500 10.0 47.0 10.0 44 670 9.0 48.0 9.0 79 500 1.0 47.0 11.0 116 400 Funding will be identified on a project-by-project basis and may include State appropriated, institutional, or restricted funds available in the campus operating budget.
| |