[January 20

The original scope of work for this project included: correction of inadequate exterior drainage by removal of existing pavement and installation of new paving materials; installation of new lighting; improvement of landscaping materials, site furnishings, and graphics; cleaning and repair of concrete and glass surfaces; painting of trim and doors; and compliance with handicapped accessibility and other applicable codes. In September 1993, the board approved a recommendation to contract with the Capital Development Board to complete additional demolition work and renovation of the interiors of the existing Lecture Center at an additional cost of $1,112,950. It is now recommended that additional revisions be made to the project. The revisions, estimated to cost $404,117, consist of providing additional interior renovation for Lecture Centers B and E and site improvements contiguous to the project in the East Campus area. State statutes provide that the Capital Development Board and the University may contract with each other and other parties on the design and construction of any project to be constructed on University property. Accordingly, with the concurrence of the appropriate administrative officers, I recommend that the University now contract with the Capital Development Board to finance the expanded project at an additional cost of $404,117 for the Lecture Center and Forum Area project. University funds are available from the institutional funds budget of the Chicago campus.

On motion of Ms. Reese, this recommendation was approved by the following vote: Aye, Mrs. Calder, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Contracts, Remodeling Classrooms, Phase II, Gregory Hall, Urbana

(15) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for remodeling the classrooms in Gregory Hall at the Urbana campus. The award in each case is to the lowest responsible bidder on the basis of its base bid. Division I — General English Brothers Company, Champaign

Base Bid Alt. # G - 1 . . . .

$190 600 1 700 $192 300

Division II — Heating, Piping, Refrigeration, and Temperature Control A & R Mechanical Contractors, Inc., Urbana Division HI — Ventilation and Air Distribution T'nT Mechanical Contractors, Inc., Urbana Division IV — Electrical Witte Electric, Champaign Total ,

Base Bid

11 625

Base Bid Base Bid

12 500 33 945 $250 370