UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1994 [PAGE 167]

Caption: Board of Trustees Minutes - 1994
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 167 of 692] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1995]

UNIVERSITY OF ILLINOIS

155

(The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Contract, Steam and Condensate Line Replacement, Chicago

(12) The chancellor at Chicago, with the advice of the vice chancellor for administration and human resources, recommends the award of a contract for $400,000 to Voris Mechanical, Inc.,1 Glendale Heights, the lowest bidder, on its base and Add Alternate for replacement of the steam and condensate line in the Medical Center District Steam Plant and Tunnel at the Chicago campus. The project consists of replacing steam and condensate lines in the Medical Center District Steam and Tunnel from the plant under West Taylor Street to connect with newly-installed steam lines for the College of Dentistry and the new Molecular Biology Research Facility. A schedule of the bids received and a description of the alternate have been filed with the secretary of the board for record. I concur.

On motion of Ms. Reese, this contract was awarded by the following vote: Aye, Mrs. Calder, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Contract, Roof Replacement, University of Illinois Hospital, Chicago

(13) The chancellor at Chicago, with the advice of the vice chancellor for administration and human resources, recommends the award of a contract for $376,000 to G. E. Riddiford Co., Inc., Arlington Heights, the lowest bidder, on its base bid for the replacement of the deteriorated roof and flashings on the University of Illinois Hospital at the Chicago campus. The project consists of removal and proper disposal of the existing built-up roof system down to the concrete deck and replacement of approximately 35,650 square feet of roof with a cold-applied, environmentally safe, built-up roof system. A schedule of the bids received has been filed with the secretary of the board for record. I concur.

On motion of Ms. Reese, this contract was awarded by the following vote: Aye, Mrs. Calder, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Supplemental Funding, Lecture Center and Forum Area, Chicago (Contract with Capital Development Board)

(14) On January 16, 1992, the Board of Trustees requested the Capital Development Board to employ the firm of Daniel P. Coffey 8c Associates, Ltd., Chicago, for Phase I of the Campus Core Upgrade project at the Chicago campus.

This firm is a minority-owned business enterprise.