Caption: Board of Trustees Minutes - 1992 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1994] UNIVERSITY OF ILLINOIS 429 Funds for the employment of the professional firms have been appropriated to the Capital Development Board for FY 1994. On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.) Waiver of University Purchasing Rules, Remodeling Room W-130 for Physical Medicine, Medical Sciences South Building, Chicago (22) The proposed $379,000 project includes remodeling work for the first floor and partial basement areas. The work consists of limited demolition, new partitions, ceilings, doors, finishes, and plumbing changes, a new air-conditioning system and distribution piping, modifications to the electrical power system, and lighting improvements. Bids for the remodeling project are to be received on January 18, 1994. While the Regulations Governing Procurement and Bidding at the University requires that separate bids be taken for the major divisions of work on a construction project (plumbing, heating, ventilation, and electrical), the changes made to the Illinois Purchasing Act in 1992 by the Illinois General Assembly permit single, lump-sum bids on such projects. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the board approve a waiver of the University's normal practices on bidding procedures to permit the solicitation of single bids for the remodeling project in the Medical Sciences South Building at the Chicago campus. On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.) Waiver of University Purchasing Rules, Remodel Fourth Floor for Dialysis Unit, Clinical Sciences North Building, Chicago (23) The proposed $1,669,500 project consists of the reconstruction and expansion of approximately 6,500 gross square feet of an existing hemodialysis unit in the Clinical Sciences North Building at the Chicago campus to accommodate 26 dialysis outpatient treatment stations, exam rooms, a waiting area, and staff support services. Also included in the proposed project will be the replacement of exterior windows, electrical distribution work, and the reconfiguration of the west end of the building for use as surge space during construction of the project. The project cost includes mechanical and electrical systems upgrade, asbestos abatement, and window replacement. Bids for the remodeling project are to be received in April 1994. While the Regulations Governing Procurement and Bidding at the University requires that separate bids be taken for the major divisions of work on a construction project (plumbing, heating, ventilation, and electrical), the changes made to the Illinois Purchasing Act in 1992 by the Illinois General Assembly permit single, lump-sum bids on such projects. Accordingly, the president of the University, with the concurrence of the
| |