UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1992 [PAGE 440]

Caption: Board of Trustees Minutes - 1992
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 440 of 628] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



428

BOARD OF TRUSTEES

(January 14

bowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Employment of Architect/Engineer, Campus Entry and Building Identification, Chicago

(20) The president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of DLK Architecture,1 Chicago, for the professional architectural and engineering services required for campus entry and building identification project at the Chicago campus. The firm's fee for the professional services required through the completion of the project will be a fixed fee of $61,700 plus reimbursements estimated to be $6,200. The $600,000 project consists of a comprehensive exterior signage program including landscaped campus entrance plazas with illuminated signs, vehicular directional signs, campus directories, free-standing building and parking facility identification signs, required ADA2 entrance signs and miscellaneous signage. The project includes the removal of existing building free-standing and building-mounted signage and consequential facade repairs. Design concepts will coordinate with existing campus graphics guidelines and entrance plaza prototypes. General interior signage guidelines and the implementation of an interior signage system for the Behavioral Sciences Building and the Science and Engineering South Building will also be included. Funds are available from the Institutional Funds Operating budget of the campus.

On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Employment of Architects/Engineers, Capital Development Board Projects, Peoria and Chicago

(21) The president of the University, with the concurrence of the appropriate administrative officers, recommends that the Board of Trustees request the Capital Development Board to employ architects and engineers as indicated below for capital projects for Fiscal Year 1994 at the Peoria School of Medicine and at the Chicago campus. The professional fee for each firm employed will be negotiated by the Capital Development Board in accordance with its procedures. Project Masonry and Window Repair — Phase I, Peoria School of Medicine Faculty Office and Labs, 1st and 4th Floors, Pharmacy Building 5th Floor Labs, Pharmacy Building Fire Safety Auxiliary Systems, Behavioral Sciences Building, Architecture and Art Building, and College of Medicine East Tower

1 2 3

Project Budget Professional Firm Recommended $921 000 Gorski Reifsteck Architects, Champaign 466 000 534 000 939 000 Teng Associates, Chicago (MBE)3 Teng Associates, Chicago (MBE) EME, Inc., Oak Brook (MBE)

DLK Architecture, Chicago, is a women-owned business enterprise. Americans with Disabilities Act. Minority-owned business enterprise.