|
| |
Caption: Board of Trustees Minutes - 1992 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
424 NET REVENUE: Patient Services Grant Revenues Other Revenues Total Net Revenues EXPENSES: Salaries and Wages Operating Expenses Total Expenses Net Revenue over Expenses BOARD OF TRUSTEES [January 14 $3 125 000 1 777 300 757 800 $5 660 100 $4 366 300 1 293 800 $5 660 100 -0- The vice president for business and finance recommends approval. I concur. On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.) Contracts, Graduate Painting Facility, Urbana (14) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for construction of a 5,000 gsf pre-engineered metal building at the Urbana campus to house private studios for the art graduate painting curriculum. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternate. Division I — General Tri-R Development Company, Champaign Base Bid Alt. 1 $137 647 3 635 $141 282 Division II — Plumbing Hart 8c Schroeder Mechanical Contractors, Inc., Champaign Division III — Heating, Refrigeration, Temperature Control, Ventilation, and Air Distribution A 8c R Mechanical Contractors, Inc., Urbana Base Bid 17 900 Base Bid Alt. 2 27 350 5 800 33 150 Division TV — Electrical Witte Electric Company, Champaign Base Bid. Alt. 2 . . . 33 950 975 34 925 Division V — Building Shell FBi Buildings, Inc., Remington, Indiana Total Base Bid 35 187 $262 444 The project consists of furnishing all labor, material, and equipment necessary
| |