[July 9

Companies, Ltd., Peoria, the lowest responsible bidder, on its base bid for the fire protection sprinkler work at the Grainger Engineering Library Information Center project at the Urbana campus. The work consists of the installation of an automatic fire sprinkler, fire pump, and related work for the Grainger Engineering Library Information Center. Funds are available from private gift funds through the University of Illinois Foundation and institutional funds of the Urbana campus. A schedule of the bids received has been filed with the secretary of the board for record. (Note: A proposal for Bid Item 21 — Fire Protection Sprinkler System was received from Automatic Sprinkler Corporation of America, Davenport, Iowa, on its base bid of $276,670. The firm has notified the University of an error in its bid and requested permission to withdraw it since, due to the error, the firm could not fulfill its contractual obligation without suffering economic hardship. The construction manager, architect/engineer, and the Office for Capital Programs have determined that there is clear and demonstrable evidence that the bidder made a bona fide error in the preparation of the bid, that the error will result in a substantial loss to the bidder, and have recommended that the bidder be allowed to withdraw its bid. Further, the construction manager and architect/engineer have talked to PIPCO about its bid and were informed that the firm understands all of the project's specified requirements. The university counsel has advised that, under these circumstances, the University's regulations allow the University to permit the withdrawal.)

On motion of Dr. Bacon, this contract was awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Contract, Roof Replacements, Orchard Downs, Urbana

(24) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $142,220 to pesigned Roofing Systems, Springfield, the lowest responsible bidder on its base bid plus acceptance of the alternates, for replacement of the roofs on the Orchard Downs apartment complex at the Urbana campus. The project consists of the removal and replacement of approximately 23,600 square feet of roof surface with a single-ply membrane system, insulation, and flashings on four two-story buildings in the Orchard Downs apartment complex. Funds are available from the Auxiliary Facilities Repair and Replacement Reserve Fund. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record.

On motion of Dr. Bacon, this contract was awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)