1992]

UNIVERSITY OF ILLINOIS

21

Division I — General R. L. Vollintine Construction, Inc., Springfield

Base Bid Alt. G-l

$68 900 1 858 $ 70 758

Division TV — Ventilation and Air Distribution Henson Robinson Company, Springfield Base Bid Division V — Electrical B&B Electric, Inc., Springfield Base Bid Total

8 724 28 430 $107 912

The project consists of remodeling approximately 4,000 square feet and includes interior demolition and new interior partitions, doors, and finishes; modifications to the existing HVAC system; and modifications to the existing electrical system including new electrical panels, wiring devices, and lighting fixtures. It is also recommended that the contracts, other than the contract for general work, be assigned to the contractor for general work. Funds are available from the State appropriated funds operating budget of the Cooperative Extension Service. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Dr. Bacon, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Contract, Hartley Selections Garden, Urbana

(22) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $679,980 to Roessler Construction Co., Rantoul, the lowest responsible bidder, on its base bid plus acceptance of alternates, for the Hartley Selections Garden at the Urbana campus. The project consists of constructing the Hartley Selections Garden, including grading, drainage, stone retaining walls, concrete extruded curbs, stone paths, wood trellises, irrigation, landscape, and lawn (sod and seed). Funds are available from a bequest from Dr. Miles C Hartley. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Dr. Bacon, this contract was awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Contract, Grainger Engineering Library Information Center, Urbana

(23) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $292,570 to The PIPCO