UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1992 [PAGE 226]

Caption: Board of Trustees Minutes - 1992
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 226 of 628] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



214

BOARD OF TRUSTEES

[March 26

Contract, Loading Dock Elevator, Mini Union, Urbana

(27) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $88,095 to W. Commercial Builders, Inc., Urbana, for the replacement of the loading dock elevator at the east end of the north building of the Illini Union at the Urbana campus. The award is to the lowest responsible bidder on its base bid. The project consists of the demolition and removal of the existing loading dock elevator, the renovation of the elevator shaft, construction of a new elevator equipment room at the dock level, the installation of a new four-stop hydraulic freight elevator with manually operated doors, new machinery, and control equipment, and related remodeling work. Funds are available from the Auxiliary Facilities System Repair and Replacement Fund. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Dr. Bacon, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Contracts, Front Entrance Renovation, Intramural-Physical Education Building, Urbana

(28) The president of the University, with the concurrence of the appropriate administrative officers, recommends that the following contracts be awarded for front entrance renovation at the Intramural-Physical Education Building at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternates. Division I — General Professional Builders Group, Champaign

Base Bid Alt. G-l Alt. G-2

$83 899 750 4 500 $ 89 149

Division II — Plumbing Hart 8c Schroeder Mechanical Contractors, Inc., Champaign Division IV — Ventilation and Air Distribution A 8c R Mechanical Contractors, Inc., Urbana Division V — Electrical Glesco Electric, Inc., Urbana Total

Base Bid

2 500

Base Bid Base Bid

5 400 13 971 $ 111 020

The project consists of removing and replacing existing ceiling and floor tile at the front entry. Also included in the work is installing a new control desk and painting existing doors and low divider walls.