ass*** r r ^ ^ ContractorCs): Strata, inc. ($32,082) Construction Start Date: May 1973 Completion: July 1973 420 H H i i n g a 2" blacktop surface and striping the „ * Project ncluded installing Project Summary: «°F-i ZU lot (now called lot A.). parking car Fiscal Year: 1973 Project: Extension of Storm Drainage System Total Project Budget: $28,000 (reappropriated capital) Architect/Engineer: Collins and Rice, Engineers Project Summary: This project was necessary because the Brookens Library construction project did not include the construction of utilities beyond the five-foot line surrounding the structure. Storm drainage from building footings is in a lower level storm sewer that empties into a creek bed north of the campus near Lake Springfield. Roof and plaza drainage is diverted to a storm sewer that goes to the retention basis. Contractor(s): Unknown Construction Start Date: Unknown Completion; Unknown •estimated .^tf^kfc. 70 mm
|