I ..Years W& Mm Remodel Cox House

S K c , Budget, $17,500 In house

• • B -

• i Summary: Following completion of the new President's residence, this building was PflBL |^J for administrative offices for the Division of Planning and Development. Contractor^): In-house Construction Start Date: May 1973* Completion: September 1973*

Fiscal Yean 1973 project: Campus External Utilities Total Project Budget: $85,000* Architect/Engineer: Respective Utilities Project Summary: Project includes: Electric service - Primary electric lines installed from south (Mischler Substation) to Brookens Library switchgear. CWLP is to install, pay for, and maintain the raceways, manholes, and cables up to the Perimeter Road (1400* +). The University was required to pay for and maintain the cable inside the Perimeter Road ($34,900). Telephone Service - Main telephone cabling into the Library. Length of the service installed is approximately 1,400 feet ($26,200). Water Service - East of the Library a 10" line was extended to a point about 500 feet from campus center. A 6" lateral was also extended ($17,700). Contractor(s): CWLP, Illinois Bell Construction Start Date: July 1973* Completion: Unknown (1974)