Repository: UIHistories Project: Board of Trustees Minutes - 1942 [PAGE 259]

Caption: Board of Trustees Minutes - 1942
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 259 of 1243] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



256

BOARD OF TRUSTEES

[April 17

SECTION V.—COAL AND ASH CONVEYOR: A. Coal and ash conveyor SECTION VI.—MISCELLANEOUS EQUIPMENT:

Poymwl fo be made to the University Clonick Advance Steel Steel Co. Salvage Corp. A. Borinstein $250 00 £150 00 I410 00 Payment lobe made to the University Advance Steel Salvage Corp. $47 50

5" 0 0 31 lo 81 So

00 00 00 00 00 00

A. B. C. D. E. F. G. H. I. J,

One One One One One One One One One One

feed water heater duplex water pump simplex water pump centrifugal pump meter, 0-600 kilowatts meter, 0-600 kilowatts meter, o-1500 kilowatts meter, o-1500 kilowatts. . meter, 0-2400 kilowatts frequency meter, 55-65 cycles Total

-

J221 50 Payment to be made by the University Clonick Advance Steel Continental Steel Co. Salvage Corp. Chimney Co. $ 7 980 00 $ 7 650 00 $ 6 050 00 6 625 00 6 220 00 5 "50 00 10 500 00 10 635 00 10 330 00

SECTION VII.—REMOVAL OF STACKS: A. One 10-ft. stack B. One 13-ft. stack BB. One 13-ft. stack, including foundation

The best bids are as follows: Payment to the Bidder University Advance Steel 86 994 50 Salvage Corp. II.—Fans Advance Steel 205 00 Salvage Corp. III.—Turbo-Generators National Power 4 550 00 Machinery Co. IV.—Motors Advance Steel 172 50 Salvage Corp. V.—Coal and Ash Conveyor. . . Advance Steel 250 00 Salvage Corp. VI.—Miscellaneous E q u i p m e n t . . Advance Steel 223 50 Salvage Corp. VII.—Removal of Stacks Continental Chimney Co. Total $12 395 50 Section I.—Boilers and Stokers Payment by the University

$17 280 00 $17 280 00

T h u s the net additional funds required to remove this equipment would be $4,884.50. T h e Director recommends the award of the following contracts: Payment to the Payment by the Section Bidder University University I.—Boilers and Stokers Advance Steel $6 994 50 Salvage Corp. III.—Turbo-Generators National Power 4 550 00 Machinery Co. V.—Coal and Ash Conveyor. . . Advance Steel 250 00 Salvage Corp. VI.—A, B, C, and D only; feed water heater and water pumps Advance Steel 211 50 Salvage Corp. VII.—Removal of 10-ft. and 13-ft. stacks, b u t not including the foundation of the 13ft. stack Continental $12 800 00 Chimney Co. __ Total $12 006 00 $12 800 00