UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1968 [PAGE 1089]

Caption: Board of Trustees Minutes - 1968
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1089 of 1460] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1968]

UNIVERSITY OF ILLINOIS

1037

DENTISTRY-MEDICINE-PHARMACY (Medical Center) Purchase $33 000 U.S. Treasury bills due 4/2S/68

KRANNERT CONTRIBUTIONS

32 888 95

Purchase $ 67 000 U . S . Treasury bills due 12/31/68 285 500 Cargill SH per cent notes due 6/30/76 18 000 Federal Land Banks 5 ^ per cent bonds due 7/20/76

ORCHARD APARTMENTS

66 199 37 285 500 00 17 730 00

Sale $30 000 U.S. Treasury 4l4 per cent notes due 8/15/68 UNION (Chicago Circle) Purchase $10 000 U.S. Treasury bills due 5/16/68

UNION AND RESIDENCE H A L L (Medical Center)

29 831 25

9 912 50

Purchase $10 000 U.S. Treasury bills due 6/13/68 Sinking Funds

ASSEMBLY H A L L

9 870 07

Sale $89 000 U.S. Treasury bills due 6/30/68

DENTISTRY-MEDICINE-PHARMACY RESERVE (Medical Center)

88 665 00

Purchase $7 000 U.S. Treasury 4 per cent bonds due 2/15/80

HOUSING REVENUE BONDS

5 957 50

Purchase $44 000 U.S. Treasury bills due 3/22/68

ILLINI U N I O N AND H E A L T H CENTER

43 904 30

Sale $1 000 U.S. Treasury 3V4 per cent bonds due 8/15/68

MEN'S RESIDENCE H A L L S OF 1957

993 44

Purchase $26 000 U.S. Treasury bills due 2/28/69

STUDENT SERVICES BUILDING

24 693 64

Purchase $7 000 U.S. Treasury bills due 2/28/69 UNION (Chicago Circle) Purchase $351 000 U.S. Treasury bills due 10/31/68 This report was received for record.

6 648 29

339 585 19

INCREASE IN CONTRACT FOR ILLIAC IV FOR EMPLOYMENT OF ENGINEER A N D ARCHITECT FOR REMODELING DIGITAL COMPUTER LABORATORY, URBANA (33) On July 27, 1967, the Board of Trustees approved the award of a contract to Burroughs Corporation for the fabrication of Illiac I V and certain components and related work. This computer is to be installed in the Digital Computer Laboratory, Urbana, which will need to be remodeled to accommodate the equipment and to permit its efficient operation. T h e total cost of this remodeling project, including architectural and engineering work, is estimated to be $1,000,000. It is now proposed that the contract with Burroughs Corporation be amended to include complete architectural and engineering services through the preparation of bid documents for the remodeling of the Digital Computer Laboratory, Urbana,