1936]

was

UNIVERSITY OF ILLINOIS

7

O n m o t i o n of M r . B a r r , C h a n g e O r d e r N o . 5 ( P l u m b i n g C o n t r a c t ) approved.

I I . Plumbing Contract Change Order No. 6 Omit Grinnell floor plates, use black wrought pipe sleeves through floors of size to allow continuous covering on pipes, use sheet metal sleeves through partitions and furred ceiling, furnish and apply additional covering through sleeves. First and second floor slab sleeves are to remain as they are and covering cups shall be furnished in these locations. No additional charge and no credit shall be made for this change, as stated in Proposal No. 14, dated June 17, 1936.

On motion of Mr. Barr, Change Order No. 6 (Plumbing Contract) was approved.

I I I . Electrical Contract Change Order No. 2 For furnishing necessary labor and material to move eight (8) 2000 watt outlets on circuits Nos. I to 8 of section No. 3 on lighting panel No. 414 approximately three (3) feet each in order to allow for revision of seating arrangement in Amphitheatre room No. 412, which will consist of the omission of one tier of seats, for the additional sum of

$65 00

On motion of Mr. Barrett, Change Order No. 2 (Electrical Contract) was approved.

IV. Heating Contract Change Order No. 1 For changes in heating work for Rooms 314, 315, and 316 to permit future completion of same for use as "Climatic Rooms," as per Granger and Bollenbacher's request letter of May 4th and Robert Gordon, Inc., Proposal No. 10 dated June 16, 1936, add $116 54 O n m o t i o n of M r s . F r e e m a n , C h a n g e O r d e r N o . 1 ( H e a t i n g C o n tract) was approved. IV. Heating Contract Change Order No. 2 For changes in heating work in Rooms 912, 919, 924, and 925; and 926 and 927, as per Granger and Bollenbacher's request letter of June 8th and Robert Gordon, Inc., Proposals No. 5, 6, 7, and 8, for the additional sums of— Room 912 $10 29 Room 919 23 99 Rooms 924 and 925 No charge Rooms 926 and 927 12 60 Total additional $46 88

On motion of Mr. Mayer, Change Order No. 2 (Heating Contract) was approved.

STUDENT CENTER BUILDING PROJECT (11) As reported to the Board at the last meeting, an application has been made to the Federal Emergency Administration of Public W o r k s for a grant of funds to aid in the construction of a Student Center Building. In submitting this application, it was necessary to include a tentative financial plan showing how the balance of the funds for the project would be raised. T h e plan submitted contemplates a campaign for cash gifts by alumni to be undertaken by the University of Illinois Foundation, and the sale of bonds by the Foundation as trustee. This tentative plan also provides that the cost of