UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1926 [PAGE 604]

Caption: Board of Trustees Minutes - 1926
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 604 of 706] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1926 ]

UNIVERSITY OF ILLINOIS Fourth Year First Semester 16 20 42— 8 86—8 40— 8 32—8 56 — 8 40 16 96 — 16

6oi

Dermatology Genito-Urinary Surgery Gynecology Hygiene Medicine Neurology Obstetrics Ophthalmology Pediatrics Psychiatry Roentgenology Surgery Surgical Pathology Operative Surgery Electives

Second Semester 16 — 8 42 24 86—16 40— 8 24 32—8 24

92 — 16 16 32 — 32 — 32 444—88 428 — 88 First Year 9+4 Second Year 914 Third Year 1064 Fourth Year 1048 Total 3970 I recommend that this curriculum be adopted and put into operation beginning with thefirstsemester of 1926-27. O n motion of M r . Armstrong, this curriculum w a s approved. STATUS OF TERM APPOINTEES (42) A statement concerning the status, under the provisions for death benefits and retiring allowances, of persons appointed for a definite term. T h e President of the University w a s requested to m a k e a recommendation o n this matter. IMPROVEMENTS NEAR STADIUM (43) A statement concerning certain drainage and pavement improvements in the neighborhood of the Stadium, which the Athletic Association is proposing to have done. The University's share of the cost will be about $26,000. O n motion of M r . Armstrong, the general plan w a s approved and the Athletic Association w a s authorized to proceed with the improvements, contracts to be awarded and all work done under the direction of the Supervising Architect, and with the understanding that the contracts for paving First and Fourth Streets be let separately, so that the University's share of the cost might be determined. RADIO STATION BUILDING (44) An estimate of the cost of construction of the building for the Roger Sullivan Memorial Radio Station. Building Construction General Contract (bid) £10,276 Heating (bid) 1,000 Plumbing (est.) 579 Telephones Studio (est.) Wiring (est.) and Superintendence Heating connections Window Memorial and Reception Rooms Lighting Fixtures(est.) Bronze Shades Architects' fees tablet Linoleum, (est.) £13,850 450 600 100 500 200 ... 45