|
| |
Caption: Board of Trustees Minutes - 1994 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1995] UNIVERSITY OF ILLINOIS Frequency 313 Procurement and Tissue Typing $1 684 389 389 389 389 000 000 000 000 000 Kidney Liver Pancreas Heart Lung 60 18 18 18 _\S_ 132 $3 240 000 It is expected that organ procurement costs will be reimbursed by third-party payors. Medicare, which covers approximately 60 percent of kidney transplant services, pays the hospital as a direct pass-through for all costs related to kidney procurement. Medicaid payment for kidney transplant services is limited to a per diem payment. Commercial and HMO payors will cover all transplant services based on availability of benefits and contractual arrangements. The goal of the transplant program is to provide transplant services at a level that would make UICMC a reimbursable transplant center for all payors. Funds will be provided from the Hospital Income Fund and are included in the FY 1996 operating budget of the hospital. The vice president for business and finance concurs. I recommend approval. On motion of Ms. Reese, this recommendation was approved by the following vote: Aye, Mrs. Calder, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Governor Edgar, Mr. Engelbrecht. (The student advisory vote was: Aye, Mr. Didato-Castillo; absent, Mr. Rose.) Contract for Renovation of Elevators, Illinois Institute for Developmental Disabilities, Chicago (25) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $395,233 to Montgomery KONE, Inc., Bensenville, the lowest responsible bidder, on its base bid and additive alternate 1 for the replacement of the main components of a deteriorated elevator system located in the Illinois Institute for Developmental Disabilities at the Chicago campus. The project consists of replacing control systems; control assemblies; machine assemblies; door operation systems; door protection systems; cab assemblies; wiring; and signal systems for four (4) elevators. Funds for the project are available in the Institutional Funds Operating Budget of the Chicago Physical Plant. A schedule of the bids received and a description of the alternate have been filed with the secretary of the board for record. On motion of Ms. Reese, this contract was awarded by the following vote: Aye, Mrs. Calder, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Governor Edgar, Mr. Engelbrecht. (The student advisory vote was: Aye, Mr. Didato-Castillo; absent, Mr. Rose.)
| |