|
| |
Caption: Board of Trustees Minutes - 1992 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1994] UNIVERSITY OF ILLINOIS 565 vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff; absent, Mr. Riley.) Contract, Excavating, Grading, and Hauling, Urbana (24) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a cost-plus contract to Dean Evans Company, Champaign, the sole bidder, for excavating, grading, and hauling at the Urbana campus for the fiscal year ending June 30, 1995. The contractor bid on percentages to be added to an estimated volume of material, labor, and subcontractors. Percent Percent Percent Total for for for Estimated Fee Material Labor Subcontracts Payments General Dean Evans Company, Champaign 9.0 47.0 9.0 $24 400 Funding will be identified on a project-by-project basis and may include State appropriated, institutional, or restricted funds available in the campus operating budget. It is recommended that the comptroller be authorized to approve work orders under this contract. A schedule of the bid received has been filed with the secretary of the board for record. (The bid received is within the Operation and Maintenance Division's estimate for the work; and it is recommended that the contract be awarded.) On motion of Dr. Bacon, this contract was awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff; absent, Mr. Riley.) Contract, Minor Building Alterations, Repairs, and New Construction, Chicago (25) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contract for minor building alterations, repairs, and new construction at the Chicago campus for the fiscal year ending June 30, 1995. The award is being made to the lowest responsible bidder. The contractors bid on percentages to be added to an estimated volume of material, labor, and subcontractors. Percent for Material General J. L. Burke Contracting, Inc., Crestwood Percent for Labor Percent for Subcontracts Total Estimated Fee Payments 0.5 33.0 2.0 $166 750 Funding will be identified on a project-by-project basis and may include State appropriated, institutional, or restricted funds available in the campus operating budget. It is recommended that the comptroller be authorized to approve work orders under this contract.
| |