564

BOARD OF TRUSTEES

[June 10

addition to the third floor of the University of Illinois Hospital at the Chicago campus for a surgicenter. The award in each case is to the lowest responsible bidder on the basis of its base bid plus acceptance of the indicated alternate. Division I — General Friedler Construction Co., Chicago Base Bid Alt. G-l $868 480 23 871 $ Division II — Plumbing A 8c H Plumbing 8c Heating Co., Elk Grove Village Division III — Heating, Piping, Refrigeration, and Temperature Controls Ideal Heating Company, Chicago Division IV — Ventilation Stern Corporation, Harvey Division V — Electrical Loyola Electrical Construction Co., Chicago Total 892 351

Base Bid

147 600

Base Bid Base Bid

261 111 173 000

Base Bid

214 000 $1 688 062

The $2,600,500 project consists of an expansion of the existing surgery area with an addition of approximately 7,500 gross square feet to the third floor over an existing second floor roof area on the north side of the University of Illinois Hospital. Major areas to be included are new surgery rooms, nurses' station/doctor charting, pre-op and post-op staff offices, and support areas. Funds are available from the University of Illinois Hospital Income Fund. A schedule of the bids received and a description of the alternate have been filed with the secretary of the board for record.

On motion of Dr. Bacon, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff; absent, Mr. Riley.)

Contract, Repair Masonry, Paulina Street Parking Structure, Chicago

(23) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $552,972 to Joseph Construction, Lynwood, the lowest responsible bidder, on the basis of its base bid plus acceptance of alternates one, two, and three, for the replacement of masonry on the Paulina Street Parking Structure at the Chicago campus. The proposed $668,700 project includes the removal and replacement of the spalling brick veneer and brick paving, repairs to the perimeter steel screen wall, planters, caulking, flashing on the stair towers, and the installation of new precast concrete benches on the sidewalk to replace the existing wooden benches. Funds are available from the Restricted Funds Operating Budget of the Campus Parking Office. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record.

On motion of Dr. Bacon, this contract was awarded by the following