UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1992 [PAGE 436]

Caption: Board of Trustees Minutes - 1992
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 436 of 628] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



424

NET REVENUE: Patient Services Grant Revenues Other Revenues Total Net Revenues EXPENSES: Salaries and Wages Operating Expenses Total Expenses Net Revenue over Expenses

BOARD OF TRUSTEES

[January 14

$3 125 000 1 777 300 757 800 $5 660 100 $4 366 300 1 293 800 $5 660 100 -0-

The vice president for business and finance recommends approval. I concur.

On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Contracts, Graduate Painting Facility, Urbana

(14) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for construction of a 5,000 gsf pre-engineered metal building at the Urbana campus to house private studios for the art graduate painting curriculum. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternate. Division I — General Tri-R Development Company, Champaign

Base Bid Alt. 1

$137 647 3 635 $141 282

Division II — Plumbing Hart 8c Schroeder Mechanical Contractors, Inc., Champaign Division III — Heating, Refrigeration, Temperature Control, Ventilation, and Air Distribution A 8c R Mechanical Contractors, Inc., Urbana

Base Bid

17 900

Base Bid Alt. 2

27 350 5 800

33 150

Division TV — Electrical Witte Electric Company, Champaign

Base Bid. Alt. 2 . . .

33 950 975

34 925

Division V — Building Shell FBi Buildings, Inc., Remington, Indiana Total

Base Bid

35 187 $262 444

The project consists of furnishing all labor, material, and equipment necessary