Total Project Budget: ^ W J | ° V CDB Project Number: 823-01(MX)7 Architect/Engin^r: Collins & Rice, Inc.

od ^^^HHW"*" Ra

$ *

Project Summary: This project was completed in two stages. Stage I was designed to provide fw construction access to the auditorium portion of the Public Affairs Center and included a crushed stone baseforthe "teardrop" entrance drive. These roads were used for construction access, then Stage II included the concrete pavement, curbs, storm drainage, and sidewalks. Construction of these improvements was planned to coincide with the completion of the PAC. Contractor^): Stage I - Reymueth Corporation ($77,450) Stage n - Evans Construction Co. ($236,600)*

•$63,800 was allocated to this project from the PAC Site Improvements project since project was over budget. Construction Start Date: Stage I - September 29, 1976; Stage II - November 1979 Completion: Stage I - May 1977; Stage II - October 1980

Fiscal Year: 1976 Project: Asphalt Paving, Service Drive and Parking Lot Total Project Budget: $30,000* CDB Project Number: N/A Architect/Engineer: In-house Project Summary: Included an asphalt overlay on M south service drive adjacent to Buildings the "K," "I," "F," and the Cox House, from Building K" to Lot "B" (now Lot "A") and the small parking section at Brookens Library. Contractors): Strata, Inc., Springfield ($26,216) Construction Start Date: June 1976 Completion: Approximately August 1976 •estimated ^ ^ ^ ^

80