1978]

UNIVERSITY OF ILLINOIS

667

Aye, Mr. Forsyth, Mr. Howard, Mr. Lenz, Mr. Livingston, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez. Mr. Hahn asked to be recorded as voting aye on Items 29 through 34 inclusive and as not voting on Item 35.

Contract for Roof Resurfacing, Center Section of Library Building, Chicago Circle

(29) The president of the University, with the concurrence of appropriate administrative officers, recommends award of a contract for $56,383 to Roofs, Inc., Western Springs, the low base bidder, for resurfacing the center section of the roof, Library Building, Chicago Circle campus. The Library Building has experienced extensive roof leaks, and patching is no longer effective. This project consists of resurfacing approximately 33,350 square feet of existing built-up roof and flashing for the center section only. T h e following bids were received on March 29, 1978: Contractor Roofs, Inc., Western Springs Rosenow Roofing, Chicago Base Bid $56 383 71 195

It is anticipated that this work will be completed in August 1978. Funds to resurface the balance of the roof are included in the FY 1979 capital request, with financing through Capital Development Bond funds. Funds for this project are available in the budget of the Physical Plant Department.

Contracts for Minor Building Maintenance, Remodeling, and New Construction for FY 1979 Chicago Campuses

(30) T h e president of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts, subject to the availability of funds, for minor building maintenance, remodeling, and new construction at the Chicago Circle and Medical Center campuses for the period of July 1, 1978, through June 30, 1979. The University would have the option to extend these contracts for an additional year under the same terms and conditions. The award in each case is to the low bidder. Percentage of Cost Material General Wm. J. Scown Building Co., Chicago Plumbing The Nu-Way Contracting Co., Chicago Heating, Process Piping, Refrigeration, and Automatic Temperature Control Certified Mechanical Contractors, Inc., Riverside Ventilation and Distribution Systems for Conditioned Air Narowetz Heating and Ventilating Co., Melrose Park Electrical G & M Electrical Contractors Co., Chicago Labor Subcontract Total Estimated Fee Payment

5 3.5

35 37

6 1

$27 500 11 500

4.5

25.5

1

23 225

4

37

2

19 400

5

38

10

36 450