UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1978 [PAGE 458]

Caption: Board of Trustees Minutes - 1978
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 458 of 756] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1977]

UNIVERSITY OF ILLINOIS

445

first floor of the High Rise Building to permit the development of a sales and rental outdoor recreation area.

Medical Center

Project Name/Category Parking Lot Improvement and Expansion/Site Improvements This project will expand the 27space gravel Lot W-4 to a 77-space blacktopped lot with lighting, attendant booth, new entrance and exit lane, landscaping, and fencing. Parking Lot Improvement and Expansion/Site Improvements This project will expand the 330space Lot E to 382 spaces, extending parking under elevated tracks and into an adjacent street which is closing. The work includes fencing, landscaping, lighting, a fire sprinkler, a protecting cover under the tracks, plus a new blacktop surface for the entire lot. Parking Lot Improvement/Site Improvements This project will upgrade the 400space Lot G (presently 50 percent gravel, 50 percent deteriorated blacktop). The work includes sewers and drainage improvements, plus a new blacktop surface over the entire lot. Anticipated Sources of Funds Medical Center Parking Revenue Bond Fund of 1976

Total Project Cost $ 58 000

Medical Center Parking Revenue Bond Fund of 1976

203 600

Medical Center Parking Revenue Bond Fund of 1976

105 000

Urbana-Champaign

Project Name/Category Surface Parking Lots at Five Locations for 393 Total Spaces/Site Improvement Beckwith Living Center/Buildings, Structures, and/or Additions Anticipated Sources of Funds Parking Development Reserve Fund Private gift to University of Illinois through University of Illinois Foundation Beckwith Memorial Trust Private gift from Mother's Association Revenue Bond Fund Reserve

Total Project Cost $ 188 000

1 000 000

Worthy Memorial Grove/Site Improvement Expansion of the Illini Union Bookstore/Buildings, Structures, and/or Additions Willard Airport Terminal Building Addition/Buildings, Structures, and/or Additions

1 500 400 000

Revenue Bonds

600 000