UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1978 [PAGE 300]

Caption: Board of Trustees Minutes - 1978
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 300 of 756] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1977]

UNIVERSITY O F ILLINOIS

'289

O n motion of Mr. Hahn, the purchases recommended were authorized by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr: Howard, Mr. Lenz, Mr. Livingston, Mr. Neai, Mrs. Kader, Mrsi Shepherd, Mr. Velasquez; no, none; absent, Governor Thompson. Report of Purchases Approved by the Vice President for Administration (29) T h e Vice President for Administration also submitted a report of purchases approved by him on recommendation of the Directors of Purchases in amounts of $7,500 to $10,000 and a report of bids taken in behalf of the Capital Development Board. A copy of this report is filed .with the Secretary. This report was received for record. The Comptroller's Monthly Report of Contracts Executed

(30) T h e Comptroller's monthly report of contracts executed was presented. Medical Center New Contracts

With Whom Easter Seal Society of Metropolitan Chicago, I n c . United States Environmental Protection Agency 68-02-2492 Total Purposg Provide on-site d e n t a l evaluation a t residential a n d d a y ' care facilities, for the developmentally disabled Models for measuring the health impact from changing levels of ambient" air pollution Amount to Bt Paid to tilt Umotrsitjt t 2 4 290 1S9 930 S 184 220

Change Orders

With Whom William J . Scown Building Company PuTpOSt Cost-plus contract — general work: R e m o v e steel sash windows o n third floor of Illinois Surgical Institute Building a n d install fifty-six Pella casement-type windows Amount to Bt Paid by tht Univtrtity t 21 0 0 0

Total

S

21 0 0 0

Urbana-Champaign New Contracts

With Wham Illinois Soybean P r o g r a m O p e r a t i n g Board: N o . 28 No. 2 9 M o u n t St. M a r y ' s College PI-22 National Soybean Processors Association Peoria School District #150 State oflllinois D e p a r t m e n t of Conservation State oflllinois Office of Education United States Air Force F19628-77-C-0108 United States A r m y Construction Engineering Research Laboratory Purpost Amoant to Bt Paid It tht Univtrtity

Genetic, chemical, a n d cultural control of races 3 a n d 4 of the soybean cyst n e m a t o d e Selection a n d m a n a g e m e n t of bees for t h e pollination of soybeans Provide P L A T O I V terminals a n d services Genetics of plasmids in rhizobium japonicum Produce a format for individual education plans a n d field testt the. I E P format in a t least two school districts Composition of sediment in Horseshoe Lake Surveys of existing a n d potential adult education programs, services, a n d students Develop Computer program for inversion of backscatter ionograms Research in t h e areas of fracture and corrosion Installation land use analysis

44 000 32 850 tl 132 24 000 9 430 6 600 22 027 57 000 10 245 7 686