1976]

UNIVERSITY OF ILLINOIS

685

and cleaning lighting fixtures in selected buildings during FY 1977 at the Chicago campuses. Funds for this work have been requested in the operating budget of the Physical Plant Department at the Chicago Circle and Medical Center campuses for FY 1977. T h e s t u d e n t a d v i s o r y v o t e w a s : Aye, M r . C o n l o n , M r . S u m m e r s , Mr. Szegho; no, none. O n m o t i o n of M r . H o w a r d , this c o n t r a c t w a s a w a r d e d b y t h e following v o t e : Aye, M r . Forsyth, M r . H a h n , M r . H o w a r d , M r . Lenz, M r . Livingston, M r . Neal, M r s . R a d e r , M r s . Shepherd, M r . Velasquez; no, n o n e ; absent, G o v e r n o r Walker.

Contract for Rental of Equipment with Operators and Materials, Chicago Circle and Medical Center

(30) The President of the University, with the concurrence of appropriate administrative officers, recommends, subject to die availability of funds, award of a costplus contract to Ryan Bros., Inc., Chicago, for furnishing the necessary materials and equipment (with operators) for snow removal and minor landscape and site work at the Chicago Circle and Medical Center campuses. The contract is for the period July 1, 1976, through June 30, 1977. The contractor will be compensated for furnishing each item of equipment, with operator, at the rate specified, and material will be supplied at the unit rate specified in the proposal. The estimated cost of the contract is $30,650. Funds have been requested in the operating budget of the Physical Plant Department for the Chicago campuses for FY 1977, and other funds will be used as they are made available from the Chicago Circle and Medical Center Parking Accounts. T h e student advisory vote w a s : Aye, M r . Conlon, M r . Szegho; no, Mr. Summers. O n m o t i o n of M r s . R a d e r , this c o n t r a c t w a s a w a r d e d b y t h e following vote: Aye, M r . Forsyth, M r . H a h n , M r . H o w a r d , M r . Lenz, M r . Livingston, M r . Neal, M r s . R a d e r , M r s . Shepherd, M r . Velasquez; no, n o n e ; absent, Governor Walker.

Approval of Appropriation by the Athletic Association and Assignment of Low Bid Received for the Replacement of Resilient Track Surface in Memorial Stadium, Urbana

(31) T h e present resilient track surface in Memorial Stadium was installed in 1967. T h e surface is uneven, and portions of the asphalt base need to be replaced. In other areas the bond between the surface and base has failed, permitting water to infiltrate. Portions of the present surface are also worn through to the base. The existing condition does not provide an acceptable facility and could result in injury. After detailed studies by the Operation and Maintenance Division, it has been determined that the surface should be replaced rather than repaired. On May 25, 1976, bids were received for resurfacing and remarking of the track. Bids were received from the Monsanto Company, St. Louis, Missouri ($180,000), and from Western Waterproofing Company, Inc., St. Louis, Missouri ($216,000). The Board of Directors of the Athletic Association on April 30, 1976, approved a special appropriation in the amount of $200,000 from the association's unappropriated surplus for the project. Approval of this action is recommended. T h e President of the University, with the concurrence of appropriate adminis-