UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1976 [PAGE 487]

Caption: Board of Trustees Minutes - 1976
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 487 of 770] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



476

BOARD OF T R U S T E E S

[December 17

On motion of Mr. Livingston, this recommendation was approved by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez ; no, none; absent, Governor Walker.

Fire Sprinkler System for Chicago Mini Union, Medical Center

(11) T h e President of the University, with the concurrence of appropriate administrative officers, recommends approval of a project to provide a fire sprinkler system in the lower level of the Chicago Illini Union at the Medical Center campus. The project is estimated to cost $30,000. The project is subject to approval by the Board of Higher Education as a "noninstructional" capital improvement.

The student advisory vote was: Aye, Mr. Conlon, Mr. Summers, Mr. Szegho; no, none. On motion of Mr. Hahn, this recommendation was approved by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Walker.

Contract for Contractor's Fee for Repairs, Minor Remodeling, and New Construction, Urbana

(12) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contract for electrical work necessary for repairs, minor remodeling, and new construction at the Urbana campus for the period December 22, 1975, through June 30, 1976. The University would hold an option to extend this contract for one year upon the same terms and conditions. „ ^ , I otal Percent Percent Percent Estimated for for for Fee Material Labor Subcontracts Payments G. L. Wilsky, an individual d / b / a Downtown Electric, Urbana 20 27 10 $13 850 This contract will be for work on projects estimated to cost less than $25,000. T h e contractors bid on percentages to be added to an estimated volume of material, labor, and subcontracts, and the award recommended is to the low bidder. A schedule of bids received has been filed with the Secretary of the Board for record.

The student advisory vote was: Aye, Mr. Conlon, Mr. Summers, Mr. Szegho; no, none. On motion of Mr. Howard, this contract was awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Walker.

Site Contract Modifications, Peoria School of Medicine

(13) On February 20, 1974, the Board of Trustees authorized the execution of a contract with the city of Peoria and the Capital Development Board for the acquisi-