UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1974 Version B [PAGE 607]

Caption: Board of Trustees Minutes - 1974 Version B
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 607 of 680] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1974]

U N I V E R S I T Y OF I L L I N O I S

599

Amount to be Paid by the University $ 14 120 $ 14 120

Change Orders

With Whom Tal Rauhoff, Inc. Total Purpose Cost-plus contract — general work: Window replacements at the Rockford School of Medicine

Urbana-Champaign New Contracts

Purpose Development of design criteria for soil-fabric-aggregate pavement systems Reduction of heat rejection in diesel engines Shore erosion control Implementation and extension of computerized environmental legislative data system Professional services for building systems design

With Whom Celanese Fibers Marketing Company Deere & Company State of Illinois — Division of Waterways United States Army DACA88-74-C-0041 Construction Engineering Research Laboratory United States Atomic Energy Commission: AT(05-1)-1630 AT(1 l-l)-2424 United States Department of Health, Education, and Welfare — Food and Drug Administration FDA 74-80 United States Department of Labor 91-17-74-29 United States Navy: N00014-67-A-0305-0026 N00014-67-A-0305-0027 The Washington University Total

Amount to be Paid to the University $ 35 000 58 286 40 000 27 152

23 600

Stratigraphic and sedimentologic factors on uranium resource potential Electric power generation from nuclear energy Enumeration of injured cells of S. aureus in foods

16 687 11 005 37 555

Pilot study of perceived occupational similarities

19 196

Develop techniques for construction of next generation computer-based information systems Electronic structure of hydrogen impurities on clean metal surfaces Ecological, public health, and economic consequences of the use of inorganic nitrogen fertilizer

91 547 43 000

16 000

$419 028 Amount to be Paid by the University $ 13 000

Purpose With Whom Human Ecology Research Provide professional services for a hail suppression Services, Inc. (Subcontract experiment in Illinois under National Science Foundation Grant Gl 37859) Rockwell International CorProvide professional services for measurement of structural materials upon hydrogen additions poration (Subcontract under National Science Foundation Grant GH 41045) Total

24 000

* 37 000

Change Orders

With Whom National Aeronautics and Space Administration: NGR 14-005-200 NGR 14-005-202 Purpose Discharge mechanism in high pressure gases Implementation of ILLIAC IV algorithms for multispectral image interpretation Study of bolted connections in high strength steel Amount to be Paid to the University $ 40 000 39 000 5 000 100 000 49 973

Research Council on Riveted and Bolted Structural Joints State of Illinois — Department Wildlife research studies of Conservation United States Air Force: AFOSR-73-2570 Control strategies for complex systems for use in aerospace avionics